The brand STRAIL® already carries the level crossing in its name: street meets rail.
The first STRAIL® level crossing was installed in 1976 and already back then it was done in close
cooperation with the client.
Since then, we have been working together with our customers on our STRAIL® level crossings, optimizing their functionality. In the meantime, more than 80,000 level crossings have been delivered and installed worldwide.
Our focus has always been on the sustainable further development of our STRAIL® products and their material properties. In doing so, we keep an eye on a steadily increasing share of the high-quality secondary raw materials used, which are processed together with virgin rubber for our fully recyclable products.
Our special, unique and patented manufacturing process guarantees a long service life and a high degree of robustness.
Even the first STRAIL® panels were produced by means of vulcanization at high temperatures under high pressure.
The manufacturing process has also been constantly developed and optimised over the years.
What used to be spread and pressed manually into moulds is now done by robots and hydraulics. A wide variety of designs meet all requirements in terms of traffic, load classes and climatic
conditions. When it comes to level crossings, STRAIL® is the number 1.
STRAIL CATALOGUE
Strail_2020_07_Brochure_gb_lowSTRAIL, Mining Catalogue
Strail_2021-mining-brochure
ARTC 08/08/2016, New Equipment & Systems Approval – Strail Rubber Level crossing
ARTC, Trial, 08-08-11-038
Discover more from Possession Planning
Subscribe to get the latest posts sent to your email.