This is a track possession imposed to rectify an urgent infrastructure problem that is threatening, or will
threaten, service continuity, or to address or remove a condition within the rail corridor that has the potential
to escalate into a serious safety threat.
Table 7 – Emergency Works Possession Notice Period
Proposed Works Possession Minimum weeks advice to
Network Planning Manager
(Network Operations)
Minimum weeks advice to rail
operators
Emergency works Not applicable Not applicable