3.1. TESTING DUE TO AN INCIDENT

Where an incident occurs at a Active Control Level Crossing provided with flashing light
warning signals and boom gates, a Maintenance Representative is to attend the Active
Control Level Crossing as soon as practicable to report on the condition of equipment
and to remedy any damage resulting from the incident. The report must be in
accordance with the PTA 8110-600-040 Procedure for Reporting Wrong Side
Failures/Irregularities.