The purpose of this rule is to outline the process for planned De-Energisation and
restoration of Overhead Supply in the Public Transport Authority (PTA) Network.
Removing Overhead Supply requires coordination between the Train Controller and
Electric Control Officer (ECO).
WARNING
De-Engergisation of the Overhead Supply does not prevent Rail Traffic
from operating within the De-Energised area