The Train Controller must make a Permanent Record of the De-Energisation of
Overhead Supply before giving clearance.
The Train Controller must prevent Rail Traffic from entering the Electrical Section by:
setting Signals at Stop;
applying Blocking Facilities; and
making sure that Protection has been applied to prevent entry by way of unsignalled
Routes.