The ECO must Authorise the temporary removal of Blocking Facilities for non-electric
Rail Traffic to enter the De-Energised Section.
The Train Controller must not permit electric Rail Traffic to enter or leave a Section
where the Overhead Supply has been De-Energised unless:
their Pantographs have been lowered and air supply isolated; and
they are hauled by non-electric Locomotives.