2. GENERAL

De-Energisation of the Overhead Supply requires coordination between Train
Controllers and the Electric Control Officer (ECO).

WARNING
Unless the Electrical Representative tells them otherwise, Workers near
Electrical Equipment and Electrical Infrastructure must treat it as Live.


Discover more from Possession Planning

Subscribe to get the latest posts sent to your email.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock