2. GENERAL

De-Energisation of the Overhead Supply requires coordination between Train
Controllers and the Electric Control Officer (ECO).

WARNING
Unless the Electrical Representative tells them otherwise, Workers near
Electrical Equipment and Electrical Infrastructure must treat it as Live.