4.3. ELECTRIC CONTROL OFFICER

The ECO prepares a BF for De-Energisation of Overhead Supply and issues the BF to
the Train Controller.
The Train Controller must give Authority to De-Energise the Overhead Supply on the
BF.
When De-Energisation of the Overhead Supply is due, ask the Train Controller to give
the Authority to De-Energise the Overhead Supply.