5.1.2. Train Controllers

Tell other affected Train Controllers that Overhead Supply has been restored.
If Blocking Facilities are not needed for Work On Track, remove:
 Signal Protection from De-Eenergised OLE; and
 Protection applied to unsignalled Routes.