6.5. PROTECTING MULTIPLE WORKSITESS

The PPO must:
 make sure the PO protects their Worksites correctly; and
 tell the POs if changes are required to Worksite Protection and make sure the
changes are carried out.
In-Field Protection for the Protection of Worksites within the LPA is a Rail
Clamped Worksite Limit Sign.
The PO must:
 make sure that In-Field Protection is placed on each side of all Worksites, as shown
in the following examples:

FIGURE 6.2: Example of Protection arrangements for individual Worksites more than
400m apart.

 

 

FIGURE 6.3: Example of Protection arrangements for multiple Worksites more than
200m but less than 400m apart. Where both mains are affected by the works, they
must be protected appropriately

 

 

FIGURE 6.4: Example of protection arrangements for combined multiple Worksites less
than 200m apart. Where both mains are affected by the works, they must be protected
appropriately.

 


Discover more from Possession Planning

Subscribe to get the latest posts sent to your email.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock