3. AUTHORISATION

Before Authorising the TOA, the Train Controller must make sure that:
 another Work On Track Authority is not in use within the proposed limits;
 approaching Rail Traffic can be Restrained at the ends of the Section that includes
the proposed limits;
 any Rail Traffic holding a Authority for Unidirectional movement has Cleared the
limits of the proposed Worksite by confirming with the PO;
o the Rail Traffic Identification Number of the lead Vehicle of a Train or the last
Vehicle of a Track Vehicle movement;
o the location of the Rail Traffic with the Rail Traffic Crew; or
o the Section is Clear.
Rail Traffic that is Stabled and not associated with the TOA and is within the limits
of the TOA, must not be Authorised to move;
Rail Traffic associated with the TOA within the limits has been identified and is being
managed as agreed by the PO and the Train Controller;
 the PO knows about any existing obstructions; and
 Blocking Facilities have been applied to prevent Unauthorised entry into the
proposed limits by Rail Traffic.

 

The Train Controller must confirm with the PO the:
 name and contact details of the PO;
 type of work;
 intended start and finish times; and
 Location using one or more of the following identifiers:
o a kilometre sign and section;
o station name;
o Overhead line Equipment (OLE) structure number;
o a Points number;
o a Signal number;
o an observance of Points or Signal Aspect change;
o a kilometre marker;
o permanent structures, such as bridge, roadway or overpass used only in
conjunction with one of the above identifiers; or
o another identifier.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock