6.4 ADJACENT LINE

If the Safety Assessment indicates that Workers need to be protected from Rail Traffic
on Adjacent lines, the PO must arrange for Adjacent lines to be protected as per
Procedure 9010 Protecting Work from Rail Traffic on Adjacent Lines.