The PO must manage all Rail Traffic movement within the TOA.
The PO must make sure that Rail Traffic associated with the TOA does not exceed the
limits of the TOA.
Rail Traffic that is associated with the TOA and is entering and travelling within the
TOA limits must:
be Piloted; or
receive written or verbal instructions from the PO.
Where a Pilot is used, the PO or a delegate must act as the Pilot.