6.2. TRAIN CONTROLLER

The Train Controller must confirm with the PO that:
 the protecting Controlled Absolute Signals have been set at Stop with Blocking
Facilities applied; and/or

 all potential Signal Routes available have had Blocking Facilities applied to protect
all entry points to the Worksite;
 the Route is Clear of Rail Traffic between the Protecting Signals and the Limits of
the Worksite;
 any Rail Traffic between the Protecting Signals and the limits of the ASB Worksite is
contained within a Work on Track Authority; or
 any Rail Traffic that has passed Complete beyond the Worksite will not return.

WARNING
When a Work on Track Authority with Rail Traffic is located between the
Protecting Signal and the ASB Worksite, the Train Controller must not
fulfil the Work on Track Authority until:
 Rail Traffic is confirmed as clear of Track; or
 the ASB has been removed.

Train Controllers must not Authorise movements into the limits of the Worksites where
ASB is in use.


Discover more from Possession Planning

Subscribe to get the latest posts sent to your email.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock