The Train Controller must determine the method of removing the Disabled Rail Traffic.
If the normal Proceed Authority permitted by the existing System of Safeworking is not
available, and the remedial working cannot be covered by Rule 6013 Passing Fixed
Signals at Stop, the Rail Traffic movement must be Authorised using an appropriate
Authority.