3.10.3.5 Temporary Works Construction Hoardings
Dust proof hoardings are required around all areas affected by demolition or building works. Hoardings shall be the minimum size required to allow access and working space and shall be stable and adequately secured. External surfaces shall be clean and snag free and shall be in 17mm thickness Stress Grade F11 waterproof plywood and shall be painted white and maintained. The Contractor shall plan the configuration of hoardings in consultation with the Project Manager and Station Management. The construction of the hoardings shall be in compliance with drawings developed for RailCorp by URS.