3.10.3.6 Temporary Works Standards and Regulations

3.10.3.6 Temporary Works Standards and Regulations
It is essential to prepare an outline of the temporary works, as part of the Specification,
that will be required during station upgrade works to ensure that adequate provisions are
made for station operations to run safely and continuously through out those works,
without any disruptions. These documents will be provided at all stages of the tender
return documents, for sign off with station staff.
Reference documents include:
• WorkCover Codes of Practice
• Australian Standards, including AS/NZ 1170 & AS1720
• RailCorp Standards including:
– Typical Construction Hoarding Design
– Construction Passenger Information Board Design
– Customer Facing Aspects of Temporary Works at Stations