AECOM S&C design team leading to the successful installation of 360/361/363A/B at Crystal Palace. Key to the success was hitting all project milestones, collaborative workshops and strong relationships with construction and assurance colleagues at VolkerRail Ltd & Network Rail

A complex S&C renewal, not only because of the bespoke nature of the S&C layout, but space constraints and interfaces with over bridges, tunnels, retaining walls and platforms, requiring great attention to detail at the design, planning and construction phases. As well as successfully interfacing with another Southern Region project in VIC 4.

Continuing with designs and delivery through control periods is also challenging. Crystal Palace fell into this category of starting in CP6 with SRSA and continued into CP7 with the new Southern Renewals Enterprise (SRE). It was extremely important this was delivered on time and safely.

Crystal Palace Works involved:
✔ Track, Signaling, ETE, E&P & Civils Design
✔ Signalling Design Cover
✔14 Track Circuits installed
✔ 1 x New Signaling location case change over
✔ 2 x SPTs installed
✔ 5 x Bespoke S&C Units, 1 x Cross Over, 2 x Turnouts, 1 x Fixed Diamond
✔ 410m of new Conductor Rail
✔ 950m of New Positive & Negative Cable installed
✔ 1 x New PHCC
✔ 4 x PHTs
✔ 11 x New TCBs
✔ Associated Civils including 65m of platform coper adjustments

More info


Discover more from Possession Planning

Subscribe to get the latest posts sent to your email.

Leave a Reply

Your email address will not be published. Required fields are marked *

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading