6.1. ENTERING THE RAIL CORRIDOR FOR WORK

Before entering the Rail Corridor the PO or Competent Worker must log into the PTA
Electronic Book On System.
If for any reason the PTA Electronic Book On System fails to record the details then the
Infrastructure Control Officer (ICO) must be contacted.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock