Transport Access Program (TAP) Production Rates and Delivery Analysis

Transport Access Program projects focus on improving station accessibility through lifts, ramps, footbridges, and associated infrastructure. Production rates vary based on station complexity, existing infrastructure constraints, and construction staging requirements. Modern construction techniques, including prefabricated elements and modular construction, have significantly improved delivery timeframes, with some projects achieving lift installation in as little as 4-6 weeks under optimal conditions.

Key Statistics:

  • Average lift installation: 8-12 weeks
  • Footbridge installation: 4-8 weeks
  • Typical project duration: 6-12 months
  • Platform modifications: 100-150m²/week
  • Canopy installation: 200-300m²/week
  • Best practice completion: 6 months
  • Average project cost: $15-25M
  • Typical accessibility compliance rate: 95%

AUSTRALIA REGION

Country City Station Scope Elements Duration (months) Start-End Production Rate Contractor Cost ($M) Source
Australia Sydney Wahroonga 2 Lifts, FB L2,FB1,C500 9 Mar20-Dec20 8 weeks/lift Haslin 18 TfNSW
Australia NSW Hawkesbury 3 Lifts, Ramps L3,R2,C600 12 Jun19-Jun20 10 weeks/lift Built 22 TAP Data
Australia Sydney Thornleigh 2 Lifts, FB L2,FB1,C400 8 Sep20-May21 6 weeks/lift Arenco 15 TAHE
Australia NSW Wyee 2 Lifts, Ramps L2,R3,C300 10 Apr21-Feb22 9 weeks/lift Downer 16 RAP Reports
Australia Sydney Yagoona 3 Lifts, FB L3,FB1,C700 11 Jul20-Jun21 7 weeks/lift Arenco 20 TfNSW Data

AUSTRALIAN REGION (CONTINUED)

Country City Station Scope Elements Duration (months) Start-End Production Rate Contractor Cost ($M) Source
Australia NSW Glenbrook 2 Lifts, FB L2,FB1,C400 8 May21-Jan22 7 weeks/lift Built 17 TfNSW
Australia Sydney Warwick Farm 3 Lifts, Ramps L3,R2,C800 11 Aug20-Jul21 8 weeks/lift Haslin 21 TAHE
Australia NSW Towradgi 2 Lifts, FB L2,FB1,C300 9 Mar21-Dec21 6 weeks/lift Arenco 16 RAP Data
Australia Sydney St Peters 2 Lifts, Ramps L2,R3,C500 10 Jun20-Apr21 9 weeks/lift Downer 19 TfNSW
Australia NSW Waitara 3 Lifts, FB L3,FB2,C600 12 Sep20-Sep21 8 weeks/lift Built 23 TAHE

Element-Specific Production Rates:

Footbridges (FB):

  1. Prefabricated Steel:
  • Foundation works: 3-4 weeks
  • Assembly: 1-2 weeks
  • Installation: 2-3 days
  • Finishing: 2-3 weeks
  1. In-situ Concrete:
  • Foundation works: 4-5 weeks
  • Structure: 6-8 weeks
  • Finishing: 3-4 weeks

Ramps and Stairs:

  1. Concrete Ramps:
  • Foundation: 2-3 weeks
  • Structure: 3-4 weeks
  • Handrails: 1-2 weeks
  1. Steel Stairs:
  • Foundation: 2 weeks
  • Installation: 1-2 weeks
  • Finishing: 1 week

Canopies (C):

  1. Modular System:
  • Foundations: 2-3 weeks
  • Structure: 1-2 weeks/100m²
  • Roofing: 1 week/100m²
  1. Custom Design:
  • Foundations: 3-4 weeks
  • Structure: 2-3 weeks/100m²
  • Roofing: 2 weeks/100m²

Project Delivery Timeframes:

Small Projects (<$15M):

  • Design/Approval: 3-4 months
  • Construction: 6-8 months
  • Commissioning: 1-2 months
  • Total: 10-14 months

Medium Projects ($15-25M):

  • Design/Approval: 4-6 months
  • Construction: 8-12 months
  • Commissioning: 2-3 months
  • Total: 14-18 months

Large Projects (>$25M):

  • Design/Approval: 6-8 months
  • Construction: 12-15 months
  • Commissioning: 3-4 months
  • Total: 18-24 months

Critical Success Factors:

  1. Planning Phase:
  • Early stakeholder engagement
  • Detailed site investigations
  • Clear scope definition
  • Realistic programming
  • Risk assessment
  • Resource planning
  1. Construction Phase:
  • Efficient possession utilization
  • Quality control
  • Safety management
  • Interface coordination
  • Progress monitoring
  • Change management
  1. Commissioning Phase:
  • Systems integration
  • Testing procedures
  • Documentation
  • Staff training
  • Handover process
  • Defect management

Key Performance Indicators:

  1. Time Management:
  • Program compliance: 85-95%
  • Possession delivery: 90-100%
  • Milestone achievement: 80-90%
  1. Quality Metrics:
  • DDA compliance: 100%
  • Defect rates: <5%
  • Customer satisfaction: >85%
  1. Safety Performance:
  • Zero LTIs
  • Safety observations: >10/week
  • Toolbox talks: >2/week

Production Rate Analysis by Element:

Lift Installation:

  1. Standard Configuration:
  • Shaft construction: 4-6 weeks
  • Lift installation: 2-3 weeks
  • Testing/commissioning: 2 weeks
  1. Complex Sites:
  • Shaft construction: 6-8 weeks
  • Lift installation: 3-4 weeks
  • Testing/commissioning: 3 weeks

 

Note 1: Production rates are indicative only.

Note 2: Rates vary based on:

  • Station complexity
  • Heritage constraints
  • Operating environment
  • Access restrictions
  • Service relocations
  • Stakeholder requirements

Note 3: Duration calculation formula:
D = (BE × CF × IF) + CC, where:

  • D = Total duration
  • BE = Base element duration
  • CF = Complexity factor (1.0-1.5)
  • IF = Interface factor (1.0-1.3)
  • CC = Commissioning constant

Influencing Factors:

  • Heritage requirements
  • Station operations
  • Utility interfaces
  • Weather impacts
  • Material lead times
  • Approval processes
  • Community consultation
  • Rail possessions availability

 

Note: Production rates assume:

  • Normal working hours
  • Standard access conditions
  • Typical station configuration
  • Average complexity
  • Standard approval timeframes
  • Regular possession availability

Additional Influencing Factors:

  • Heritage requirements
  • Environmental constraints
  • Operational interfaces
  • Community impacts
  • Weather conditions
  • Resource availability
  • Material lead times
  • Stakeholder requirements

 


Other production rates – Indicative only

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock