Van Elle was proud to support the development of the Great Western Main Line (GWML) station at Old Oak Common, commissioned by HS2 Ltd and delivered in collaboration with South Rail Systems Alliance On Networks Works (SRSA). The SRSA alliance comprises Colas Rail, Network Rail, and AECOM.

Van Elle’s scope included planning and executing foundation installations, supplying specialist plant, and providing skilled labour to complete the works efficiently.

Key Deliverables

  • Installed 26No. CHS steel-driven piles (762mm and 610mm diameter).

  • Installed 10No. concrete-encased auger piles (1,000mm diameter, 9m depth).

  • Installed a special foundation pile (650mm diameter, 6.75m depth) with a 950mm x 950mm x 750mm concrete cap.

Project Success

  • Overcame challenging ground conditions through a design-led approach.

  • Provided tailored foundation solutions to meet project requirements.

  • Delivered a high-quality, cost-effective solution using in-house expertise and specialist plant.


More Info

 

 


Discover more from Possession Planning

Subscribe to get the latest posts sent to your email.

By Possession Planning

Possession Planning is dedicated to providing news and insights for rail and road possession planning and delivery. Our mission is to serve as the premier information source for industry professionals managing critical infrastructure access, maintenance windows, and construction scheduling. Our Partners: FR2 Infrastructure | We Simplify Complexity | Construction Methodology | S | Energy Planning | Staging Diagrams . |

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading