A Train Controller must tell the relieving Train Controller about any conditions that
could affect the operation of the PTA Network on Form 4030-409-003 Train Control
Handover Sheet.
Rail, Roads, Infrastructure
A Train Controller must tell the relieving Train Controller about any conditions that
could affect the operation of the PTA Network on Form 4030-409-003 Train Control
Handover Sheet.
We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.