Before entering the Rail Corridor, the Protection Officer (PO) must log into the PTA’s
Electronic Book On System. When the work is completed, the PO must log off in the
Electronic Book On System.
If for any reason the Electronic Book On System fails to record the PO’s details then
the PO must contact the Infrastructure Control Officer (ICO).