Mauritania’s rail network primarily serves the mining industry, with the main line operated by SNIM (Société Nationale Industrielle et Minière) for iron ore transport from Zouérat to the port of Nouadhibou.
Network Overview
| Parameter | Statistics | Notes |
|---|---|---|
| Total Track Length | 728 km | Single line |
| Active Lines | 704 km | Mining railway |
| Track Gauge | 1,435 mm | Standard gauge |
| Electrification | None | Diesel operation |
| Primary Usage | Iron Ore | Limited passenger service |
Major Line
SNIM Railway
| Section | Length (km) | Status | Usage |
|---|---|---|---|
| Zouérat-Nouadhibou | 704 | Active | Mining/Passenger |
| Branch Lines | 24 | Active | Mining only |
Technical Parameters
Track & Civil Infrastructure
| Parameter | Specification | Standard/Reference | Notes |
|---|---|---|---|
| Track Gauge | 1,435 mm | Standard gauge | Heavy haul |
| Rail Profile | 60 kg/m | Heavy duty | Mining traffic |
| Maximum Speed | 40-60 km/h | Operational | Freight focus |
| Axle Load | 30 tonnes | Design load | Ore trains |
| Maximum Train Length | 2.5 km | Operational | Ore trains |
Rolling Stock
Locomotives
| Type | Quantity | Power (kW) | Status | Usage |
|---|---|---|---|---|
| EMD SD40-2 | 15 | 3,000 | Active | Main line |
| EMD GT46 | 8 | 3,600 | Active | Heavy haul |
| Various Shunters | 6 | Various | Mixed | Yard operations |
Wagons
| Type | Quantity | Capacity (tons) | Status |
|---|---|---|---|
| Ore Wagons | 650 | 84 | Active |
| Service Cars | 40 | Various | Active |
| Passenger Cars | 3 | 72 seats | Limited |
Operations
Freight Services
| Service | Frequency | Capacity | Annual Volume |
|---|---|---|---|
| Iron Ore Trains | 8-10 daily | 22,000 tons | 18M tonnes |
| Other Freight | Limited | Variable | Minimal |
Passenger Service
| Route | Frequency | Journey Time | Annual Passengers |
|---|---|---|---|
| Zouérat-Nouadhibou | 2x weekly | 18h | 30,000* |
*Estimated figures
Infrastructure Condition
Track Status
| Condition | Percentage | Maintenance Need |
|---|---|---|
| Good | 60% | Regular |
| Fair | 30% | Planned |
| Poor | 10% | Priority |
Desert Operations
| Challenge | Mitigation | Status |
|---|---|---|
| Sand Accumulation | Regular clearing | Ongoing |
| Heat Impact | Track monitoring | Active |
| Water Scarcity | Resource management | Continuous |
Development Projects
Current Projects (2025-2026)
| Project | Budget (USD) | Status | Completion |
|---|---|---|---|
| Track Renewal | 85M | Ongoing | 2026 |
| Rolling Stock | 120M | Active | 2026 |
| Signaling Upgrade | 45M | Planning | 2026 |
Future Plans (2026-2030)
| Project | Estimated Cost | Status | Notes |
|---|---|---|---|
| Capacity Expansion | 200M | Proposed | Mining growth |
| New Branch Lines | 150M | Planning | Mine access |
| Passenger Upgrade | 25M | Concept | Service improvement |
Environmental Impact
Climate Adaptation
| Challenge | Impact | Mitigation Strategy |
|---|---|---|
| Desert Environment | High | Specialized maintenance |
| Water Resources | Critical | Efficiency measures |
| Dust Control | High | Protection systems |
Economic Impact
Employment
| Sector | Direct Jobs | Indirect Jobs |
|---|---|---|
| Operations | 850 | 2,550 |
| Maintenance | 450 | 1,350 |
| Support | 200 | 600 |
Mining Support
| Aspect | Impact | Value |
|---|---|---|
| Export Capacity | Critical | 18M tonnes/year |
| Economic Contribution | High | ~25% of GDP* |
| Regional Development | Significant | Northern region |
*Related to mining operations supported by rail
Safety and Security
Measures
| Area | Implementation | Status |
|---|---|---|
| Track Patrols | Regular | Active |
| Security Forces | Dedicated | Continuous |
| Emergency Response | 24/7 | Operational |