Introduction
Nepal’s rail network is limited but developing, with a focus on connectivity to India and plans for broader rail development. The challenging mountainous terrain significantly influences infrastructure development.
Network Overview
| Parameter |
Statistics |
Notes |
| Total Track Length |
42 km |
Active lines |
| Under Construction |
125 km |
Various projects |
| Planned Network |
945 km |
Future development |
| Track Gauge |
Mixed |
Broad/Standard |
| International Connections |
2 |
India (active/planned) |
Existing Lines
Operational Routes
| Route |
Length (km) |
Gauge |
Status |
Usage |
| Jaynagar-Kurtha |
35 |
1,676 mm |
Active |
Passenger |
| Raxaul-Birgunj |
7 |
1,676 mm |
Active |
Freight |
Major Projects Under Construction
Priority Lines
| Project |
Length (km) |
Gauge |
Status |
Completion |
| Bardibas-Nijgadh |
69 |
1,676 mm |
Construction |
2026 |
| Kerung-Kathmandu |
72 |
1,435 mm |
Planning |
2028* |
| East-West Railway |
945 |
1,676 mm |
Planning |
2030* |
*Projected dates
Technical Parameters
Track & Civil Infrastructure
| Parameter |
Specification |
Standard/Reference |
Notes |
| Track Gauge |
1,676/1,435 mm |
Mixed |
Project dependent |
| Maximum Gradient |
4% |
Design limit |
Mountain sections |
| Minimum Curve Radius |
200m |
Design standard |
Terrain adapted |
| Axle Load |
25 tonnes |
Design load |
New construction |
Rolling Stock
Current Fleet
| Type |
Quantity |
Manufacturer |
Status |
Usage |
| DEMU Sets |
2 |
CRRC |
Active |
Passenger |
| Locomotives |
3 |
Various |
Active |
Freight |
| Passenger Cars |
6 |
Various |
Active |
Regular service |
Planned Acquisitions
| Type |
Quantity |
Timeline |
Purpose |
| DEMU Sets |
5 |
2026 |
Expansion |
| Electric Loco |
8 |
2027 |
New lines |
| Passenger Cars |
15 |
2026 |
Capacity increase |
Operations
Passenger Services
| Route |
Frequency |
Journey Time |
Annual Passengers |
| Jaynagar-Kurtha |
Daily |
45min |
200,000* |
| Future Services |
Planned |
Various |
Projected |
*Estimated figures
Freight Traffic
| Type |
Annual Volume (tonnes) |
Route |
Status |
| Container |
500,000 |
Birgunj ICD |
Active |
| Bulk Cargo |
300,000 |
Various |
Planning |
Infrastructure Development
Current Projects (2025-2026)
| Project |
Budget (USD M) |
Status |
Completion |
| Track Construction |
450 |
Ongoing |
2026 |
| Station Development |
120 |
Active |
2026 |
| Signaling Systems |
80 |
Planning |
2026 |
Future Plans (2026-2030)
| Project |
Estimated Cost (USD B) |
Status |
Notes |
| Trans-Himalayan |
5.5 |
Planning |
China connection |
| East-West Railway |
3.0 |
Proposed |
National corridor |
| Urban Rail |
2.5 |
Concept |
Kathmandu Valley |
Environmental Challenges
Terrain Adaptation
| Challenge |
Impact |
Mitigation Strategy |
| Mountain Terrain |
Critical |
Tunnel/bridge solutions |
| Landslides |
High |
Slope protection |
| River Crossings |
High |
Special structures |
Economic Impact
Employment Generation
| Phase |
Direct Jobs |
Indirect Jobs |
| Construction |
5,000 |
15,000 |
| Operations |
2,000 |
6,000 |
| Maintenance |
1,000 |
3,000 |
International Cooperation
Development Partners
| Country |
Project Involvement |
Type of Support |
| India |
Multiple projects |
Technical/Financial |
| China |
Trans-Himalayan |
Planning/Technical |
| ADB |
Various |
Financial |
Technical Challenges
Mountain Railway Solutions
| Aspect |
Challenge |
Solution |
| Gradient |
Steep terrain |
Spiral tunnels |
| Geology |
Unstable rock |
Special foundations |
| Weather |
Extreme conditions |
All-weather design |