Solomon Islands Transport Network Profile

The Solomon Islands has no rail network. Transportation infrastructure focuses on maritime connectivity between islands, limited road networks on major islands, and air services connecting the archipelago.

Transport Infrastructure Overview

Road Network

Parameter Statistics Notes
Total Road Length 1,875 km All islands
Paved Roads 170 km 9% of network
Guadalcanal Roads 650 km Main island
Other Islands 1,225 km Various conditions

Maritime Infrastructure

Major Ports

Facility Location Type Usage
Honiara Port Guadalcanal Multi-purpose Main gateway
Noro Western Province Commercial Fishing/Cargo
Gizo Western Province Mixed Tourism/Local
Auki Malaita Regional Local/Cargo

Inter-island Services

Service Type Coverage Frequency Vessel Type
Main Routes Major islands Weekly Medium vessels
Local Services Provincial Variable Small craft
Cargo Services National Monthly Cargo ships

Air Transport

Airports

Facility Location Type Runway Length
Henderson International Honiara International 2,200m
Munda Western Province Regional 1,800m
Auki Malaita Domestic 1,200m
Gizo Western Province Domestic 900m

Development Projects

Current Projects (2025-2026)

Project Budget (USD M) Status Completion
Road Rehabilitation 25 Ongoing 2026
Port Upgrade 35 Active 2026
Airport Safety 15 Planning 2026

Future Plans

Initiative Estimated Cost (USD M) Status Timeline
Maritime Safety 20 Proposed 2027
Rural Transport 15 Planning 2027-2028
Transport Integration 10 Concept 2028

Environmental Considerations

Climate Adaptation

Challenge Impact Mitigation Strategy
Sea Level Rise Critical Infrastructure elevation
Extreme Weather High Resilient design
Coastal Erosion High Protection measures
Heavy Rainfall High Drainage systems

Economic Impact

Transport Sector

Area Direct Jobs Annual Value (USD M)
Maritime 800 25
Aviation 400 15
Road Transport 600 10

Development Priorities

Short Term (2025-2026)

Priority Scope Investment Need
Maritime Safety Infrastructure High
Road Maintenance Essential Medium
Air Navigation Systems Medium

Long Term Vision

Goal Approach Timeline
Sustainability Climate resilience 2030
Connectivity Inter-island integration 2028
Rural Access Infrastructure development 2027

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Geographic Dispersion High Maritime focus
Climate Vulnerability Critical Resilient infrastructure
Resource Limitations High International cooperation
Maintenance Costs High Sustainable funding

International Support

Development Partners

Partner Focus Area Support Type
World Bank Infrastructure Financial/Technical
ADB Transport Loans/Grants
Australia Maritime Safety Technical Assistance
Japan Port Development Investment

Emergency Preparedness

Transport Resilience

Aspect Measure Status
Emergency Routes Designated Active
Port Protection Basic measures In place
Airport Readiness Weather protocols Active
Alternative Routes Limited Under study
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock