2. GENERAL

Conditions that can or do affect the safety of operations in the PTA Network must be
reported promptly to the Train Controller responsible for the affected Section.
At times it may be necessary to reduce the speed of Rail Traffic to protect
Infrastructure and to ensure the safety of Rail Traffic during periods of severe weather.
The Train Controller must make a Permanent Record about the report.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock