Home / Possession Planning / Rail Planning / Australia, Bulli – Railway Infrastructure Enhancement with Pioneering SENNEBOGEN 613 Deployment

Australia, Bulli – Railway Infrastructure Enhancement with Pioneering SENNEBOGEN 613 Deployment

Project Overview

The deployment of Australia‘s sole SENNEBOGEN 613 marks a significant advancement in railway infrastructure maintenance methodology. This specialized equipment supports critical retaining wall construction along Sydney Trains’ South Coast line.

Equipment Specifications

Parameter Detail
Model SENNEBOGEN 613
Type Telescopic Crane
Max Reach 18.8 meters
Lifting Capacity 16 tonnes
Operating Weight 22.5 tonnes

 

More Info

 

 

SENNEBOGEN 613 E

Ideal for use on construction sites and for assembly work: Its compact dimensions and the fact that it can be transported easily and cheaply, makes the SENNEBOGEN 613 E a very popular assistant for many construction companies and an ideal machine for rental stock. Thanks to the series standard Full-Power Boom the telecrane can telescope under load.

 

Brochures

Tagged:

Leave a Reply

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock

Discover more from Possession Planning

Subscribe now to keep reading and get access to the full archive.

Continue reading