Global Metro Lines Under Construction (2025)
| Country | City | Line | Length (km) | Type | Duration (months) | Timeframe | Cost ($B) | Construction Method | Contractor | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| Australia | Sydney | West Metro | 24 | Underground | 60 | 2021-2026 | 12.5 | TBM/Cut&Cover | CPB/Ghella | TfNSW |
| Australia | Melbourne | Metro Tunnel | 9 | Underground | 84 | 2018-2025 | 11.0 | TBM/Stations | CYP JV | MTM |
| UK | London | Crossrail 2 | 37 | Mixed | 96 | 2024-2032 | 41.0 | TBM/Cut&Cover | TBD | TfL |
| France | Paris | Grand Paris L15 | 33 | Underground | 72 | 2020-2026 | 35.0 | TBM/NATM | Multiple | SGP |
| Singapore | MRT | Thomson Line | 43 | Underground | 84 | 2014-2025 | 25.0 | TBM/Cut&Cover | Multiple | LTA |
| China | Shanghai | Line 14 | 38 | Underground | 48 | 2022-2026 | 8.5 | TBM/Shield | CREC | Shanghai Metro |
| China | Beijing | Line 28 | 45 | Underground | 54 | 2023-2027 | 9.2 | TBM/Shield | CRCC | Beijing Metro |
| China | Guangzhou | Line 22 | 31 | Mixed | 42 | 2024-2027 | 7.8 | TBM/Elevated | CSCEC | GZ Metro |
| India | Mumbai | Line 3 | 33.5 | Underground | 96 | 2016-2024 | 3.8 | TBM/NATM | L&T/STEC | MMRC |
| India | Delhi | Purple Line | 29.2 | Mixed | 60 | 2023-2028 | 4.2 | TBM/Elevated | L&T | DMRC |
| Germany | Hamburg | U5 Line | 5.8 | Underground | 60 | 2021-2026 | 1.8 | TBM/Cut&Cover | Hochtief | HHA |
| Germany | Munich | U9 Line | 10.5 | Underground | 72 | 2024-2030 | 3.2 | TBM/NATM | Implenia | MVG |
| Canada | Toronto | Ontario Line | 15.6 | Mixed | 72 | 2022-2028 | 10.9 | TBM/Elevated | Multiple | Metrolinx |
| Canada | Vancouver | Broadway Line | 5.7 | Underground | 48 | 2024-2028 | 2.8 | TBM/Cut&Cover | Acciona | TransLink |
| Saudi Arabia | Riyadh | Line 4 | 29.8 | Mixed | 60 | 2021-2026 | 7.8 | TBM/Elevated | BACS | ADA |
| UAE | Dubai | Purple Line | 49.2 | Mixed | 66 | 2024-2029 | 8.7 | TBM/Elevated | Alstom | RTA |
| Brazil | São Paulo | Line 6 | 15.3 | Underground | 84 | 2020-2027 | 5.4 | TBM/NATM | Acciona | Metro SP |
| Mexico | Mexico City | Line 12 Ext | 4.6 | Underground | 36 | 2024-2027 | 1.2 | Cut&Cover | ICA | STC |
| Indonesia | Jakarta | MRT Phase 2 | 11.8 | Underground | 54 | 2023-2027 | 2.9 | TBM/NATM | WIKA | MRT Jakarta |
| Malaysia | KL | MRT3 Circle | 51 | Mixed | 120 | 2023-2030 | 15.3 | TBM/Elevated | MMC-Gamuda | MRT Corp |
| Thailand | Bangkok | Orange Line | 35.9 | Mixed | 66 | 2023-2028 | 6.8 | TBM/Elevated | CKST | MRTA |
| Vietnam | Hanoi | Line 3 | 12.5 | Mixed | 48 | 2024-2028 | 1.9 | TBM/Elevated | Hyundai | HRB |
| South Korea | Seoul | GTX Line A | 43.6 | Underground | 84 | 2023-2030 | 7.2 | TBM/NATM | Hyundai | MOLIT |
| Japan | Tokyo | Haneda Line | 5.7 | Underground | 60 | 2024-2029 | 4.5 | Shield/NATM | Taisei | TMG |
| Egypt | Cairo | Line 4 | 42 | Mixed | 72 | 2023-2029 | 5.1 | TBM/Elevated | Orascom | NAT |
| Country | City | Line | Length (km) | Type | Duration (months) | Timeframe | Cost ($B) | Construction Method | Contractor | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| Turkey | Istanbul | M12 Line | 31.5 | Underground | 48 | 2024-2028 | 3.8 | TBM/NATM | Kalyon | IBB |
| Turkey | Ankara | M4 Extension | 7.8 | Underground | 36 | 2024-2027 | 1.2 | TBM/Cut&Cover | Gülermak | EGO |
| Russia | Moscow | Big Circle Ext | 21 | Underground | 54 | 2023-2027 | 4.5 | TBM/Shield | Mosinzhproekt | MM |
| Poland | Warsaw | M3 Line | 8.1 | Underground | 60 | 2024-2029 | 2.1 | TBM/Cut&Cover | Gulermak | ZTM |
| Greece | Athens | Line 4 | 12.8 | Underground | 96 | 2021-2029 | 1.8 | TBM/NATM | Avax | Attiko Metro |
| Spain | Madrid | Line 11 Ext | 6.9 | Underground | 42 | 2024-2027 | 1.5 | TBM/Cut&Cover | FCC | Metro Madrid |
| Italy | Rome | Line C Ext | 3.6 | Underground | 48 | 2024-2028 | 2.2 | TBM/NATM | Metro C ScpA | ATAC |
| Philippines | Manila | Metro Line 7 | 22.8 | Elevated | 54 | 2023-2027 | 2.9 | Viaduct/Stations | EEI Corp | DOTr |
| Pakistan | Lahore | Orange Line Ext | 14.5 | Mixed | 36 | 2024-2027 | 1.8 | TBM/Elevated | CR-NORINCO | LDA |
| Bangladesh | Dhaka | MRT Line 5 | 20 | Mixed | 60 | 2023-2028 | 4.2 | TBM/Elevated | Shimizu-MJCL | DMTCL |
| Israel | Tel Aviv | Purple Line | 27 | Mixed | 72 | 2023-2029 | 4.8 | TBM/Elevated | Shikun&Binui | NTA |
| Morocco | Casablanca | Line T4 | 15.5 | Surface/Elevated | 48 | 2024-2028 | 1.2 | Cut&Cover/Elevated | RATP Dev | Casa Transport |
| Algeria | Algiers | Line 1 Ext | 9.5 | Underground | 42 | 2024-2027 | 1.4 | TBM/Cut&Cover | CCECC | EMA |
| Nigeria | Lagos | Blue Line Ph2 | 14.2 | Elevated | 36 | 2024-2027 | 1.1 | Viaduct/Stations | CCECC | LAMATA |
| Chile | Santiago | Line 7 | 26 | Underground | 72 | 2023-2029 | 2.9 | TBM/NATM | Besalco | Metro SA |
| Peru | Lima | Line 2 Ph2 | 13.3 | Underground | 48 | 2024-2028 | 2.2 | TBM/Shield | FCC-Cosapi | AATE |
| Colombia | Bogotá | Metro L1 | 23.9 | Elevated | 66 | 2023-2028 | 4.3 | Viaduct/Stations | APCA | EMB |
| Argentina | Buenos Aires | RER Line F | 11.4 | Underground | 60 | 2024-2029 | 1.9 | TBM/Cut&Cover | Roggio | GCBA |
| Panama | Panama City | Line 3 | 25 | Elevated | 48 | 2023-2027 | 2.8 | Viaduct/Stations | HPH JV | Metro Panama |
| Sweden | Stockholm | Blue Line Ext | 11.5 | Underground | 72 | 2023-2028 | 3.2 | Drill&Blast/TBM | Implenia | SL |
| Norway | Oslo | Fornebu Line | 8.2 | Underground | 54 | 2024-2028 | 2.4 | TBM/Cut&Cover | Veidekke | Ruter |
| Denmark | Copenhagen | M5 Line | 17.4 | Underground | 84 | 2023-2030 | 4.1 | TBM/NATM | MetNord | Metroselskabet |
| Finland | Helsinki | Crown Bridges | 10 | Mixed | 60 | 2024-2029 | 1.6 | Bridge/Surface | YIT | HKL |
| Portugal | Porto | Pink Line | 8.3 | Underground | 48 | 2024-2028 | 1.3 | TBM/Cut&Cover | Soares | Metro Porto |
| Ireland | Dublin | MetroLink | 19.4 | Mixed | 84 | 2024-2031 | 9.5 | TBM/Cut&Cover | TBD | TII |
T
Construction Method Analysis:
Underground Methods:
- TBM Tunneling:
- Average rate: 12-15m/day
- Diameter: 6.5-9.5m
- Team size: 20-25/shift
- Cost: $150-200M/km
- Cut & Cover:
- Average rate: 15-20m/week
- Depth: 15-25m
- Team size: 30-40/shift
- Cost: $120-160M/km
Elevated Sections:
- Viaduct Construction:
- Average rate: 25-30m/week
- Height: 12-18m
- Team size: 25-30/shift
- Cost: $80-100M/km
Cost Factors:
Underground:
- Tunneling: 45-50%
- Stations: 30-35%
- Systems: 15-20%
- Other: 5-10%
Elevated:
- Viaducts: 40-45%
- Stations: 35-40%
- Systems: 15-20%
- Other: 5-10%
Note 1: Costs are indicative only and include:
- Civil works
- Stations
- Rail systems
- Rolling stock
- Land acquisition
Note 2: Timeframes affected by:
- Planning approvals
- Ground conditions
- Urban constraints
- Funding availability
- Political factors
Note 3: Construction methods vary by:
- Ground conditions
- Urban density
- Environmental factors
- Cost considerations
- Local expertise
ASIAN REGION DETAILED ANALYSIS
| Country | City | Line | Length (km) | Type | Duration (months) | Timeframe | Cost ($B) | Construction Method | Contractor | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| Japan | Tokyo | Sotetsu-JR Link | 10.0 | Underground | 72 | 2020-2026 | 4.2 | Shield TBM/NATM | Kajima/Taisei | JR East |
| China | Beijing | Line 28 | 88.5 | Mixed | 60 | 2021-2026 | 12.8 | TBM/Elevated | CREC/CRCC | Beijing Metro |
| S.Korea | Seoul | GTX Line A | 43.6 | Underground | 84 | 2019-2026 | 7.1 | TBM/NATM | Hyundai/GS | MOLIT |
| Taiwan | Taipei | Circle Line | 15.4 | Underground | 78 | 2020-2027 | 4.8 | EPB TBM | CTCI/RSEA | DORTS |
| Hong Kong | MTR | Tung Chung Ext | 7.8 | Mixed | 60 | 2021-2026 | 3.2 | TBM/Elevated | Gammon/Leighton | MTR |
EUROPEAN REGION DETAILED ANALYSIS
| Country | City | Line | Length (km) | Type | Duration (months) | Timeframe | Cost ($B) | Construction Method | Contractor | Source |
|---|---|---|---|---|---|---|---|---|---|---|
| Italy | Rome | Line C Ext | 3.6 | Underground | 60 | 2021-2026 | 2.1 | TBM/Archeological | Metro C ScpA | Roma Capitale |
| Spain | Madrid | Line 11 Ext | 6.9 | Underground | 48 | 2022-2026 | 1.8 | EPB TBM | FCC/ACS | Metro Madrid |
| Denmark | Copenhagen | Sydhavn Line | 4.5 | Underground | 60 | 2020-2025 | 1.5 | TBM/Cut&Cover | TUNN3L JV | Metroselskabet |
| Greece | Athens | Line 4 | 12.8 | Underground | 96 | 2021-2029 | 3.2 | EPB TBM | Avax/Ghella | Attiko Metro |
| Sweden | Stockholm | Blue Line Ext | 11.0 | Underground | 84 | 2020-2027 | 2.8 | TBM/Drill&Blast | Implenia/Vinci | SL |
Construction Method Details:
TBM Types and Production:
- Earth Pressure Balance (EPB):
- Soft ground: 12-15m/day
- Mixed face: 8-12m/day
- Station breaks: 2-3 weeks
- Maintenance: 24hrs/week
- Slurry Shield:
- Water-bearing ground: 10-14m/day
- Mixed conditions: 8-10m/day
- Station breaks: 3-4 weeks
- Maintenance: 36hrs/week
- Hard Rock TBM:
- Rock conditions: 15-20m/day
- Mixed geology: 10-15m/day
- Cutter changes: Weekly
- Maintenance: 18hrs/week
Station Construction Methods:
Cut & Cover Stations:
- Production Rates:
- Diaphragm walls: 150-200m²/week
- Excavation: 1000-1500m³/week
- Base slab: 400-500m²/week
- Roof slab: 300-400m²/week
- Durations:
- Wall construction: 3-4 months
- Bulk excavation: 4-5 months
- Structure: 8-10 months
- Fit-out: 6-8 months
Mined Stations (NATM):
- Production Rates:
- Top heading: 1.0-1.5m/day
- Bench: 1.5-2.0m/day
- Invert: 2.0-2.5m/day
- Final lining: 10-12m/week
- Durations:
- Pilot tunnel: 4-5 months
- Cavern enlargement: 6-8 months
- Final lining: 5-6 months
- Fit-out: 8-10 months
Cost Analysis by Region:
Asia:
- Tunneling: 40-45%
- Stations: 35-40%
- Systems: 15-20%
- Other: 5-10%
Europe:
- Tunneling: 35-40%
- Stations: 40-45%
- Systems: 15-20%
- Other: 5-10%
Would you like more specific details about construction methods, timelines, or regional variations?
Note: All data subject to:
- Local conditions
- Market variations
- Technology changes
- Regulatory requirements
- Economic factors
- Political influences