200 PMP terms with short definitions

Comprehensive list of 200 PMP terms with short definitions:

A-C

  1. Acceptance Criteria – Conditions that must be met before deliverables are accepted
  2. Activity – A distinct, scheduled portion of work performed during a project
  3. Activity Duration – The time in calendar units between the start and finish of an activity
  4. Activity List – A documented tabulation of schedule activities
  5. Actual Cost (AC) – The realized cost incurred for work performed on an activity
  6. Actual Duration – The time in calendar units between the actual start and finish dates
  7. Agile – An iterative approach to project management and software development
  8. Analogous Estimating – Using historical data from similar projects to estimate current project parameters
  9. Assumption – A factor considered to be true without proof or demonstration
  10. Authority – The right to apply project resources and make decisions
  11. Backward Pass – A critical path method technique for calculating late start and finish dates
  12. Baseline – The approved version of a work product used as a basis for comparison
  13. Bottom-up Estimating – Estimating by aggregating estimates of lower-level components
  14. Budget – The approved estimate for the project or any work breakdown structure component
  15. Budget at Completion (BAC) – The sum of all budgets established for work to be performed
  16. Business Case – A documented economic feasibility study used to establish validity of benefits
  17. Change Control – A process whereby modifications are identified, documented, and controlled
  18. Change Control Board (CCB) – A formally chartered group responsible for reviewing change requests
  19. Change Request – A formal proposal to modify any document, deliverable, or baseline
  20. Charter – A document that formally authorizes the existence of a project
  21. Checklist – A list of items to be noted, checked, or remembered
  22. Closing Process Group – Processes performed to formally complete or close a project or phase
  23. Code of Accounts – A numbering system used to uniquely identify each component of the WBS
  24. Communication Management Plan – A component of the project management plan describing how communications will be planned, structured, and monitored
  25. Configuration Management – A collection of procedures to track project artifacts and monitor changes
  26. Constraint – A limiting factor that affects the execution of a project
  27. Contingency Reserve – Budget within the cost baseline allocated for identified risks
  28. Control – Comparing actual performance with planned performance and taking corrective action
  29. Control Account – A management control point where scope, budget, and schedule are integrated
  30. Cost Management Plan – A component of the project management plan that describes how costs will be planned, structured, and controlled
  31. Cost Performance Index (CPI) – A measure of cost efficiency of budgeted resources (EV/AC)
  32. Cost Variance (CV) – The amount of budget deficit or surplus at a given point in time (EV-AC)
  33. Crashing – A technique used to shorten the schedule duration by adding resources
  34. Critical Activity – Any activity on the critical path in a project schedule
  35. Critical Chain Method – A schedule method that modifies the project schedule to account for limited resources
  36. Critical Path – The sequence of activities that represents the longest path through a project
  37. Critical Path Method (CPM) – A method used to estimate minimum project duration and determine schedule flexibility

D-F

  1. Decision Tree Analysis – A diagramming technique used to determine the best course of action
  2. Decomposition – A technique for dividing project deliverables into smaller, manageable components
  3. Defect – An imperfection or deficiency in a project component
  4. Deliverable – Any unique and verifiable product, result, or capability to perform a service
  5. Dependency – A relationship between two activities or between an activity and a milestone
  6. Duration – The total number of work periods required to complete an activity
  7. Early Finish Date (EF) – The earliest possible point in time when an activity can finish
  8. Early Start Date (ES) – The earliest possible point in time when an activity can begin
  9. Earned Value (EV) – The measure of work performed expressed in terms of the budget authorized
  10. Earned Value Management (EVM) – A methodology that combines scope, schedule, and resource measurements
  11. Effort – The number of labor units required to complete an activity
  12. Enterprise Environmental Factors – Conditions not under the control of the project team that influence the project
  13. Estimate – A quantitative assessment of the likely amount or outcome
  14. Estimate at Completion (EAC) – The expected total cost of completing all work
  15. Estimate to Complete (ETC) – The expected cost to finish all remaining project work
  16. Executing Process Group – Processes performed to complete the work defined in the project management plan
  17. Expert Judgment – Judgment provided based on expertise in an application area
  18. Fast Tracking – A schedule compression technique where activities normally done in sequence are performed in parallel
  19. Finish-to-Finish (FF) – A logical relationship where a successor activity cannot finish until a predecessor activity has finished
  20. Finish-to-Start (FS) – A logical relationship where a successor activity cannot start until a predecessor activity has finished
  21. Float – The amount of time that an activity can be delayed without delaying the project end date
  22. Flowchart – A graphical representation of a process showing the relationships among process steps
  23. Forward Pass – A critical path method technique for calculating early start and finish dates
  24. Free Float – The amount of time an activity can be delayed without delaying the early start of any successor
  25. Functional Manager – Someone with management authority over an organizational unit
  26. Functional Organization – An organizational structure where staff is grouped by areas of specialization

G-L

  1. Gantt Chart – A bar chart of schedule information showing start and finish dates
  2. Gold Plating – Adding extra functionality or features not required by the scope
  3. Ground Rules – A list of acceptable and unacceptable behaviors adopted by a project team
  4. Hammock Activity – A schedule activity that spans over a segment of a project
  5. Histogram – A bar chart showing a distribution of variables
  6. Human Resource Management Plan – A component of the project management plan describing how team roles and responsibilities will be assigned
  7. Hybrid – A combination of two or more agile and non-agile elements
  8. Impact – The positive or negative effect of a risk event
  9. Initiating Process Group – Processes performed to define a new project or phase
  10. Inspection – Examination of a work product to determine whether it conforms to documented standards
  11. Issue – A current condition or situation that may have an impact on the project objectives
  12. Issue Log – A project document where information about issues is recorded and monitored
  13. Iteration – A timeboxed cycle of development on a product or deliverable
  14. Kanban – A visual system for managing work as it moves through a process
  15. Kickoff Meeting – A meeting held at the beginning of a project to align expectations
  16. Knowledge Area – An identified area of project management defined by its knowledge requirements
  17. Lag – The amount of time whereby a successor activity is required to be delayed
  18. Late Finish Date (LF) – The latest possible point in time that an activity may be completed
  19. Late Start Date (LS) – The latest possible point in time that an activity may begin
  20. Lead – The amount of time whereby a successor activity can be advanced
  21. Lessons Learned – The knowledge gained during a project which shows how project events were addressed
  22. Life Cycle – The series of phases that a project passes through from its initiation to its closure
  23. Logic – The collection of activity dependencies that makes up a project schedule network diagram

M-P

  1. Management Reserve – An amount of the project budget withheld for management control purposes
  2. Matrix Organization – Any organizational structure in which the project manager shares responsibility
  3. Milestone – A significant point or event in a project
  4. Milestone List – A list identifying all project milestones and indicates whether the milestone is mandatory
  5. Monitor – Collect project performance data with respect to a plan
  6. Monitoring and Controlling Process Group – Processes required to track, review, and regulate project progress
  7. Monte Carlo Simulation – A technique that computes project cost or schedule using simulation
  8. Network Diagram – A schematic display of the logical relationships among project activities
  9. Node – A point at which dependency lines connect on a schedule network diagram
  10. Organizational Breakdown Structure (OBS) – A hierarchical representation of the project organization
  11. Organizational Process Assets – Plans, processes, policies, procedures, and knowledge bases specific to the organization
  12. Parametric Estimating – An estimating technique that uses a statistical relationship between historical data
  13. Pareto Chart – A histogram ordered by frequency of occurrence
  14. Path – A sequence of activities connected by logical relationships
  15. Percent Complete – An estimate expressed as a percent of the amount of work that has been completed
  16. Performance Measurement Baseline – An integrated scope-schedule-cost baseline used for comparison
  17. Phase – A collection of logically related project activities that culminates in completion of deliverables
  18. Phase Gate – A review at the end of a phase in which a decision is made to continue to the next phase
  19. Planned Value (PV) – The authorized budget assigned to scheduled work
  20. Planning Process Group – Processes required to establish the scope of the project and define actions
  21. PMBOK Guide – Project Management Body of Knowledge Guide
  22. PMI – Project Management Institute
  23. PMO – Project Management Office
  24. Portfolio – A collection of projects or programs grouped together to facilitate effective management
  25. Precedence Diagramming Method (PDM) – A technique used for constructing a schedule model
  26. Predecessor Activity – An activity that logically comes before a dependent activity
  27. Preventive Action – An intentional activity that ensures future performance of project work
  28. Probability – The likelihood that an event will occur
  29. Process – A systematic series of activities directed toward causing an end result
  30. Process Group – A logical grouping of project management inputs, tools and techniques, and outputs
  31. Procurement Management Plan – A component of the project management plan that describes how procurement processes will be managed
  32. Product – An artifact that is produced, is quantifiable, and can be either an end item or a component item
  33. Product Scope – The features and functions that characterize a product, service, or result
  34. Program – Related projects, subsidiary programs, and program activities managed in a coordinated way
  35. Progressive Elaboration – The iterative process of increasing the level of detail in a project management plan
  36. Project – A temporary endeavor undertaken to create a unique product, service, or result
  37. Project Calendar – A calendar that identifies working days and shifts available for scheduled activities
  38. Project Charter – A document issued by the project initiator that formally authorizes the existence of a project
  39. Project Life Cycle – The series of phases that a project passes through from its initiation to its closure
  40. Project Management – The application of knowledge, skills, tools, and techniques to project activities
  41. Project Management Information System (PMIS) – An information system consisting of tools and techniques
  42. Project Management Office (PMO) – A management structure that standardizes project-related governance processes
  43. Project Management Plan – The document that describes how the project will be executed, monitored, and controlled
  44. Project Manager – The person assigned by the performing organization to lead the team responsible for achieving project objectives
  45. Project Schedule – An output of a schedule model that presents linked activities with planned dates
  46. Project Scope – The work performed to deliver a product, service, or result with the specified features
  47. Project Scope Statement – The description of the project scope, major deliverables, assumptions, and constraints
  48. Projectized Organization – Any organizational structure in which the project manager has full authority

Q-S

  1. Quality – The degree to which a set of inherent characteristics fulfills requirements
  2. Quality Assurance – The process of auditing quality requirements and results from quality control measurements
  3. Quality Control – The process of monitoring and recording results of executing quality activities
  4. Quality Management Plan – A component of the project management plan that describes how quality policies will be implemented
  5. RACI Chart – A common type of responsibility assignment matrix that uses Responsible, Accountable, Consult, and Inform
  6. Requirements – A condition or capability that is required to be present in a product, service, or result
  7. Requirements Management Plan – A component of the project management plan that describes how requirements will be analyzed, documented, and managed
  8. Requirements Traceability Matrix – A grid that links product requirements from their origin to the deliverables
  9. Reserve – A provision in the project management plan to mitigate cost and/or schedule risk
  10. Resource – Skilled human resources, equipment, services, supplies, commodities, material, budgets, or funds
  11. Resource Calendar – A calendar that identifies the working days and shifts upon which each specific resource is available
  12. Resource Histogram – A bar chart showing the amount of time that a resource is scheduled to work
  13. Resource Leveling – A technique in which start and finish dates are adjusted based on resource constraints
  14. Resource Smoothing – A technique that adjusts the activities of a schedule model such that requirements for resources do not exceed certain predefined limits
  15. Responsibility Assignment Matrix (RAM) – A grid that shows the project resources assigned to each work package
  16. Risk – An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives
  17. Risk Breakdown Structure (RBS) – A hierarchical representation of potential sources of risk
  18. Risk Management Plan – A component of the project management plan that describes how risk management activities will be structured
  19. Risk Register – A document in which the results of risk analysis and risk response planning are recorded
  20. Rolling Wave Planning – An iterative planning technique in which work to be accomplished in the near term is planned in detail
  21. Root Cause Analysis – An analytical technique used to determine the basic underlying reason that causes a variance
  22. Schedule – See Project Schedule
  23. Schedule Baseline – The approved version of a schedule model that can be changed only through formal change control procedures
  24. Schedule Compression – Techniques used to shorten the schedule duration without reducing the project scope
  25. Schedule Management Plan – A component of the project management plan that establishes the criteria and activities for developing, monitoring, and controlling the schedule
  26. Schedule Network Analysis – The technique of identifying early and late start dates and early and late finish dates
  27. Schedule Performance Index (SPI) – A measure of schedule efficiency expressed as the ratio of earned value to planned value
  28. Schedule Variance (SV) – A measure of schedule performance expressed as the difference between the earned value and the planned value
  29. Scope – The sum of the products, services, and results to be provided as a project
  30. Scope Baseline – The approved version of a scope statement, work breakdown structure, and its associated WBS dictionary
  31. Scope Creep – The uncontrolled expansion to product or project scope without adjustments to time, cost, and resources
  32. Scope Management Plan – A component of the project management plan that describes how the scope will be defined, developed, monitored, controlled, and validated
  33. Scrum – An agile framework for developing, delivering, and sustaining complex products
  34. Sensitivity Analysis – A quantitative risk analysis technique used to help determine which risks have the most potential impact
  35. Slack – See Total Float
  36. Sponsor – A person or group who provides resources and support for the project and is accountable for enabling success
  37. Sprint – An iteration in Scrum, typically lasting 2-4 weeks
  38. Stakeholder – An individual, group, or organization who may affect, be affected by, or perceive itself to be affected by a decision
  39. Stakeholder Management Plan – A component of the project management plan that describes how stakeholder engagement will be managed
  40. Start-to-Finish (SF) – A logical relationship in which a successor activity cannot finish until a predecessor activity has started
  41. Start-to-Start (SS) – A logical relationship in which a successor activity cannot start until a predecessor activity has started
  42. Statement of Work (SOW) – A narrative description of products, services, or results to be delivered by the project
  43. Successor Activity – A dependent activity that logically comes after another activity in a schedule
  44. SWOT Analysis – Analysis of strengths, weaknesses, opportunities, and threats of an organization, project, or option

T-Z

  1. Template – A partially complete document in a predefined format that provides a defined structure
  2. Three-Point Estimating – A technique used to estimate cost or duration by applying an average of optimistic, pessimistic, and most likely estimates
  3. Threshold – The cost, time, quality, technical, or resource value used as a parameter
  4. Time and Material (T&M) – A type of contract that is a hybrid contractual arrangement containing aspects of both cost-reimbursable and fixed-price contracts
  5. To-Complete Performance Index (TCPI) – A measure of the cost performance that is required to be achieved
  6. Total Float – The amount of time that an activity can be delayed from its early start date without delaying the project finish date
  7. Trend Analysis – An analytical technique that uses mathematical models to forecast future outcomes
  8. Trigger – An indication that a risk has occurred or is about to occur
  9. User Story – A brief description of functionality as experienced by a user
  10. Validation – The assurance that a product, service, or result meets the needs of the customer
  11. Value Engineering – An approach used to optimize project life cycle costs
  12. Variance – A quantifiable deviation, departure, or divergence away from a known baseline
  13. Variance Analysis – A technique for determining the cause and degree of difference between the baseline and actual performance
  14. Velocity – A measure of a team’s productivity rate at which the deliverables are produced
  15. Verification – The evaluation of whether or not a product, service, or result complies with a regulation, requirement, specification, or imposed condition
  16. Virtual Team – A group of people with a shared goal who fulfill their roles with little or no time spent meeting face to face
  17. Voice of the Customer – A planning technique used to provide products, services, and results that truly reflect customer requirements
  18. Waterfall – A traditional project management approach that is linear and sequential
  19. What-If Scenario Analysis – The process of evaluating scenarios in order to predict their effect on project objectives
  20. Work Breakdown Structure (WBS) – A hierarchical decomposition of the total scope of work to be carried out by the project team
  21. Work Package – The work defined at the lowest level of the work breakdown structure for which cost and duration can be estimated and managed
  22. Work Performance Data – The raw observations and measurements identified during activities being performed to carry out the project work

This comprehensive list covers the essential PMP terminology across all knowledge areas and process groups, providing a solid foundation for PMP exam preparation and project management practice.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock