Active Control Level Crossing Warning equipment must be tested by Authorised on-site
testers.
A Permanent Record must be made of the test results.
Testing may be suspended only on the Authority of the Signals Maintenance
Representative.
Rail, Roads, Infrastructure
Active Control Level Crossing Warning equipment must be tested by Authorised on-site
testers.
A Permanent Record must be made of the test results.
Testing may be suspended only on the Authority of the Signals Maintenance
Representative.
We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.