4.1. AFFECTED TRAIN CONTROLLERS

The affected Train Controllers must make sure that the details for the De-Energisation
of Overhead Supply are correct and:
 give Authority to the ECO; and
 make a Permanent Record about the De-Energisation of Overhead Supply.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock