4.3. TRAIN CONTROLLERS

The Train Controller must make a Permanent Record of the De-Energisation of
Overhead Supply before giving clearance.
The Train Controller must prevent Rail Traffic from entering the Electrical Section by:
 setting Signals at Stop;
 applying Blocking Facilities; and
 making sure that Protection has been applied to prevent entry by way of unsignalled
Routes.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO