5. AUTHORISING TRAVEL BETWEEN BETWEEN LIVE AND DE-ENERGISED SECTIONS

The ECO must Authorise the temporary removal of Blocking Facilities for non-electric
Rail Traffic to enter the De-Energised Section.
The Train Controller must not permit electric Rail Traffic to enter or leave a Section
where the Overhead Supply has been De-Energised unless:
 their Pantographs have been lowered and air supply isolated; and
 they are hauled by non-electric Locomotives.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO