3.1. ENTERING THE RAIL CORRIDOR FOR WORK

Before entering the Rail Corridor, the Protection Officer (PO) must log into the PTA’s
Electronic Book On System. When the work is completed, the PO must log off in the
Electronic Book On System.
If for any reason the Electronic Book On System fails to record the PO’s details then
the PO must contact the Infrastructure Control Officer (ICO).

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock