5.3. PLACING LOOKOUTS

The PO must ensure:
 that the Locations of Lookouts and the visibility conditions give Lookouts enough
Sighting Distance of approaching Rail Traffic;
 that Lookouts have Effective Communication with Workers and are equipped with an
audible Warning device;
 when working in Bidirectional locations where rail traffic can approach from either
direction:
o a minimum of one (1) Lookout is placed either side of the Worksite and a
minimum of five (5) seconds reaction time can be achieved when calculating the
Sighting Distance; or
o a single Lookout is placed to provide warning for both directions and a minimum
of 15 seconds reaction time can be achieved when calculating the Sighting
Distance.
 that when Rail Traffic approaches, Lookouts can warn Workers in time to allow them
to:
o react to the Warning of the approach of Rail Traffic; and
o move themselves and their equipment to a Safe Place before the Rail Traffic
arrives.

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO