2.1. TESTING EQUIPMENT

Prior to entering the PTA Network, Rail Traffic Crew must ensure that the following
equipment is fully operational:
 speedometer, if this can be checked;
 Motive Power Unit lights;
 Motive Power Unit Whistle;
 End-of-Train Marker or End-of-Train Monitor;
 communications equipment; and
 Driver Supervisory Systems

Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO