Liechtenstein’s rail network consists of 9.5 kilometers of track, operated as part of the Austrian Federal Railways (ÖBB) network. The system serves as an important transit route between Austria and Switzerland.

Network Overview

Parameter Statistics Notes
Total Track Length 9.5 km Single track
Stations 3 Active stations
Track Gauge 1,435 mm Standard gauge
Electrification 15 kV AC Austrian system
International Connections 2 Austria, Switzerland

Infrastructure Details

Main Line

Section Length (km) Status Usage
Feldkirch-Buchs 9.5 Active Passenger/Freight
Schaan-Vaduz 3.5 Active Main station section

Stations

Station Type Facilities Daily Passengers
Schaan-Vaduz Main Full service 2,500
Forst Hilti Halt Basic 300
Nendeln Local Standard 800

Technical Parameters

Track & Civil Infrastructure

Parameter Specification Standard/Reference Notes
Track Gauge 1,435 mm UIC Standard Standard gauge
Rail Profile UIC 60 EN 13674-1 Main line
Electrification 15 kV/16.7 Hz ÖBB Standard Austrian system
Maximum Speed 120 km/h Design speed Passenger service
Axle Load 22.5 tonnes UIC Mixed traffic

Operations

Passenger Services

Service Frequency Operator Daily Services
Regional Hourly ÖBB 18 pairs
International 2-hourly SBB/ÖBB 8 pairs

Passenger Statistics

Type Annual Passengers Trend Notes
Commuter 450,000 Growing Work/School
International 250,000 Stable Transit
Tourism 100,000 Growing Seasonal

Freight Traffic

Type Annual Volume (tons) Direction Trend
Transit 350,000 Both Stable
Import 80,000 Inbound Growing
Export 60,000 Outbound Stable

Infrastructure Condition

Track Status

Component Condition Last Renewal Next Renewal
Rails Good 2018 2028
Sleepers Good 2018 2028
Ballast Good 2018 2026
Signaling Excellent 2020 2035

Power Supply

Component Type Status Maintenance
Catenary Fixed Good Annual
Substations 15 kV Good Bi-annual
Return Circuit Standard Good Annual

Development Projects

Current Projects (2025-2026)

Project Budget (CHF) Status Completion
Station Modernization 8M Ongoing 2026
Signaling Upgrade 5M Planning 2026
Platform Extensions 3M Active 2025

Future Plans (2026-2030)

Project Estimated Cost (CHF) Status Notes
Double Track Study 2M Planned Feasibility
Noise Protection 4M Proposed Environmental
Digital Signaling 6M Concept ETCS L2

Environmental Initiatives

Sustainability Programs

Initiative Target Timeline Status
Noise Reduction -20% 2027 Active
Energy Efficiency +15% 2026 Ongoing
Green Power 100% 2025 Achieved

Environmental Protection

Measure Location Status Impact
Noise Barriers Urban areas Partial Positive
Wildlife Crossings Rural sections Complete Positive
Water Protection All lines Ongoing Positive

Integration

International Coordination

Aspect Partner Status Notes
Operations ÖBB Active Main operator
Ticketing SBB/ÖBB Integrated Through tickets
Maintenance ÖBB Contract Annual agreement
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock