Mali Rail Network Profile

Mali’s rail network consists primarily of one main line connecting Bamako to Dakar (Senegal), historically known as the Dakar-Niger Railway. The system faces significant rehabilitation needs and operational challenges.

Network Overview

Parameter Statistics Notes
Total Track Length 729 km Within Mali
Active Lines 642 km Limited operation
Track Gauge 1,000 mm Meter gauge
International Connections 1 To Senegal
Operational Status Limited Rehabilitation needed

Major Lines

Main Route

Section Length (km) Status Usage
Bamako-Kayes 498 Limited Mixed traffic
Kayes-Border 144 Limited Mixed traffic
Branch Lines 87 Inactive Various

Technical Parameters

Track & Civil Infrastructure

Parameter Specification Standard/Reference Notes
Track Gauge 1,000 mm Meter gauge Colonial era
Rail Profile 30 kg/m Light rail Original design
Maximum Speed 40 km/h Operational Limited by condition
Axle Load 15 tonnes Limited Infrastructure constraints

Rolling Stock

Locomotives

Type Quantity Status Age (years) Usage
CC 2200 6 Mixed 40+ Main line
BB 1600 4 Limited 45+ Shunting
Various 5 Inactive 35+ Stored

Passenger Cars

Type Quantity Capacity Status Service
Standard Coach 12 80 seats Limited Regular
Mixed Class 8 60 seats Poor Limited
Service Cars 4 N/A Mixed Support

Freight Wagons

Type Quantity Capacity (tons) Status
Covered 85 25 Limited
Platform 65 30 Mixed
Tank 20 25 Poor

Operations

Passenger Services

Route Frequency Journey Time Annual Passengers
Bamako-Kayes Weekly* 15-20h 50,000*
International Limited 36h+ 20,000*

*When operational

Freight Traffic

Commodity Annual Volume (tons) Direction Trend
General Cargo 100,000* Both Declining
Agricultural 50,000* Export Seasonal
Mining Products 30,000* Export Variable

*Estimated figures

Infrastructure Condition

Track Status

Condition Percentage Maintenance Need
Good 15% Regular
Fair 35% Urgent
Poor 50% Critical

Structures

Type Quantity Average Age Condition
Bridges 47 80+ years Critical
Culverts 200+ Various Poor
Stations 24 Various Mixed

Development Projects

Current Projects (2025-2026)

Project Budget (USD) Status Completion
Track Rehabilitation 85M Planning 2026
Bridge Repairs 25M Proposed 2026
Station Upgrades 15M Concept 2026

Future Plans (2026-2030)

Project Estimated Cost Status Notes
Network Revival 450M Proposed International funding
Rolling Stock 120M Planning Fleet renewal
Signaling 40M Concept Basic systems

Environmental Challenges

Climate Adaptation

Challenge Impact Mitigation Strategy
Heat High Track monitoring
Flooding Medium Drainage improvements
Dust/Sand High Protection measures

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 400 1,200
Maintenance 200 600
Support 100 300

Regional Development

Impact Area Benefit Status
Trade Access Limited Declining
Agriculture Moderate Seasonal
Mining Potential Underdeveloped
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO