Moldova Rail Network Profile

Moldova’s rail network is operated by Calea Ferată din Moldova (CFM), featuring broad gauge infrastructure inherited from the Soviet era, with modernization efforts ongoing through European support.

Network Overview

Parameter Statistics Notes
Total Track Length 1,232 km Active network
Main Lines 1,100 km Primary routes
Branch Lines 132 km Secondary/industrial
Track Gauge 1,520 mm Broad gauge
Electrified Lines 0 km Diesel operation
International Connections 2 Romania, Ukraine

Major Lines

Main Routes

Route Length (km) Status Usage
Chișinău-Ungheni 110 Active Main west line
Chișinău-Bender 73 Limited Eastern route
Bălți-Ocnița 168 Active Northern line
Chișinău-Giurgiulești 228 Active Port access

Technical Parameters

Track & Civil Infrastructure

Parameter Specification Standard/Reference Notes
Track Gauge 1,520 mm GOST Standard Broad gauge
Rail Profile R65/R50 GOST Mixed types
Maximum Speed 100 km/h Operational Passenger
Axle Load 22.5 tonnes Design load Freight
Signaling Semi-automatic Various Modernization needed

Rolling Stock

Locomotives

Type Quantity Age (years) Status Usage
2TE10M 25 30-40 Active Main freight
ChME3 40 35-45 Mixed Shunting
M62 15 35+ Limited Mixed traffic

Passenger Cars

Type Quantity Capacity Status Service
Long Distance 85 54 seats Mixed International
Regional 60 81 seats Active Domestic
Suburban 40 110 seats Limited Local

Freight Wagons

Type Quantity Capacity (tons) Status
Covered 2,500 68 Mixed
Platform 1,800 72 Active
Tank 800 60 Active
Other 1,200 Various Mixed

Operations

Passenger Services

Route Daily Services Journey Time Annual Passengers
Chișinău-Ungheni 4 2h 30m 250,000
Chișinău-Ocnița 2 4h 180,000
International Various Various 120,000

Freight Traffic

Type Annual Volume (M tonnes) Direction Trend
Transit 3.5 Various Stable
Import 2.8 Inbound Growing
Export 2.2 Outbound Growing
Domestic 1.5 Internal Stable

Infrastructure Development

Current Projects (2025-2026)

Project Budget (€M) Status Completion
Track Rehabilitation 85 Ongoing 2026
Signaling Upgrade 45 Active 2026
Station Modernization 30 Planning 2026

Future Plans (2026-2030)

Project Estimated Cost (€M) Status Notes
Network Modernization 250 Planning EU support
Rolling Stock Renewal 150 Proposed Fleet upgrade
Gauge Conversion Study 20 Concept European integration

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -25% 2030 Planning
Energy Efficiency +30% 2028 Active
Noise Reduction -20% 2027 Proposed

Cross-Border Operations

International Connections

Border Services Status Notes
Romania Limited Active Gauge change
Ukraine Regular Variable Political factors

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 5,500 16,500
Maintenance 2,800 8,400
Administration 1,200 3,600
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO