Namibia’s rail network, operated by TransNamib, primarily serves mining operations and port connections, with the main line linking the Port of Walvis Bay to inland regions and neighboring countries.
Network Overview
| Parameter | Statistics | Notes |
|---|---|---|
| Total Track Length | 2,687 km | Active lines |
| Main Lines | 2,400 km | Primary routes |
| Branch Lines | 287 km | Mining/industrial |
| Track Gauge | 1,067 mm | Cape gauge |
| Electrified Lines | 0 km | Diesel operation |
| International Connections | 2 | South Africa, Zambia |
Major Lines
Main Routes
| Route | Length (km) | Status | Usage |
|---|---|---|---|
| Walvis Bay-Windhoek | 382 | Active | Main corridor |
| Windhoek-Gobabis | 228 | Active | Eastern line |
| Windhoek-Keetmanshoop | 578 | Active | Southern line |
| Kranzberg-Tsumeb | 425 | Active | Northern line |
Technical Parameters
Track & Civil Infrastructure
| Parameter | Specification | Standard/Reference | Notes |
|---|---|---|---|
| Track Gauge | 1,067 mm | Cape gauge | Colonial era |
| Rail Profile | 48 kg/m | Various | Mixed standards |
| Maximum Speed | 80 km/h | Operational | Main lines |
| Axle Load | 18.5 tonnes | Design load | Standard |
Rolling Stock
Locomotives
| Type | Quantity | Status | Usage | Age (years) |
|---|---|---|---|---|
| GE U20C | 25 | Active | Main line | 30-40 |
| GE U23C | 15 | Mixed | Heavy haul | 25-35 |
| Various | 20 | Limited | Shunting | 35+ |
Passenger Cars
| Type | Quantity | Capacity | Status | Service |
|---|---|---|---|---|
| StarLine | 30 | 64 seats | Active | Long distance |
| Economy | 45 | 88 seats | Mixed | Regular |
| Service Cars | 10 | N/A | Active | Support |
Freight Wagons
| Type | Quantity | Capacity (tons) | Status |
|---|---|---|---|
| Container Flats | 300 | 40 | Active |
| Bulk Wagons | 450 | 40 | Mixed |
| Tank Cars | 120 | 35 | Active |
| General Purpose | 280 | Various | Mixed |
Operations
Passenger Services
| Route | Frequency | Journey Time | Annual Passengers |
|---|---|---|---|
| Windhoek-Walvis Bay | 3x weekly | 7h | 80,000 |
| Windhoek-Keetmanshoop | Weekly | 12h | 40,000 |
| Windhoek-Tsumeb | 2x weekly | 10h | 60,000 |
Freight Traffic
| Commodity | Annual Volume (M tonnes) | Direction | Trend |
|---|---|---|---|
| Containers | 1.2 | Both | Growing |
| Mining Products | 0.8 | Export | Stable |
| Fuel | 0.6 | Import | Stable |
| General Cargo | 0.4 | Various | Growing |
Infrastructure Development
Current Projects (2025-2026)
| Project | Budget (USD M) | Status | Completion |
|---|---|---|---|
| Track Rehabilitation | 150 | Ongoing | 2026 |
| Bridge Repairs | 45 | Active | 2026 |
| Signaling Upgrade | 30 | Planning | 2026 |
Future Plans (2026-2030)
| Project | Estimated Cost (USD M) | Status | Notes |
|---|---|---|---|
| Network Extension | 400 | Proposed | New connections |
| Rolling Stock | 200 | Planning | Fleet renewal |
| Port Integration | 150 | Concept | Efficiency improvement |
Environmental Challenges
Climate Adaptation
| Challenge | Impact | Mitigation Strategy |
|---|---|---|
| Desert Conditions | High | Special maintenance |
| Heat Impact | High | Track monitoring |
| Sand Accumulation | Critical | Regular clearing |
Economic Impact
Employment
| Sector | Direct Jobs | Indirect Jobs |
|---|---|---|
| Operations | 1,800 | 5,400 |
| Maintenance | 800 | 2,400 |
| Support | 400 | 1,200 |
Port Integration
Rail-Port Connections
| Port | Daily Trains | Annual Capacity (M tonnes) | Status |
|---|---|---|---|
| Walvis Bay | 6 | 4.0 | Active |
| Lüderitz | 2 | 0.8 | Limited |
International Transit
Cross-Border Traffic
| Country | Annual Volume (M tonnes) | Main Commodities |
|---|---|---|
| South Africa | 0.8 | Mixed/Minerals |
| Zambia | 0.3 | Copper/General |
| Botswana | 0.2 | Various |