Qatar Rail Network Profile

Qatar operates a modern metro system in Doha and a light rail network in Lusail, both developed as part of the country’s preparation for the 2022 FIFA World Cup and Vision 2030.

Network Overview

Parameter Statistics Notes
Total Track Length 176 km Combined systems
Doha Metro 76 km 3 lines operational
Lusail Tram 28 km Light rail system
Track Gauge 1,435 mm Standard gauge
Electrified Lines 100% 750V DC/1500V DC

Major Systems

Doha Metro

Line Length (km) Stations Daily Riders Color
Red Line 40 18 200,000* Red
Green Line 22 11 150,000* Green
Gold Line 14 11 100,000* Gold

*Estimated figures

Lusail Tram

Line Length (km) Stations Status Color
Pink Line 6.6 10 Active Pink
Purple Line 7.0 8 Active Purple
Yellow Line 5.4 7 Active Yellow
Green Line 9.0 13 Active Green

Technical Parameters

Infrastructure

Parameter Metro Tram
Track Gauge 1,435mm 1,435mm
Power Supply 750V DC 750V DC
Max Speed 100 km/h 60 km/h
Signaling CBTC CBTC

Rolling Stock

Metro Fleet

Type Quantity Manufacturer Capacity Features
Metro Trains 75 Kinki Sharyo 416 Driverless
Standard Sets 3 cars Climate controlled Gold/Family/Standard Classes

Tram Fleet

Type Quantity Manufacturer Capacity Features
Trams 28 Alstom 209 Climate controlled
Citadis 5 modules Low floor Catenary-free Operation

Operations

Service Levels

System Peak Frequency Off-Peak Operating Hours
Metro 2-3 mins 5-8 mins 05:30-00:00
Tram 5 mins 7-10 mins 06:00-23:00

Infrastructure Development

Current Projects (2025-2026)

Project Budget (USD B) Status Completion
Metro Extensions 3.5 Planning 2026
Integration Hubs 0.8 Active 2025
Smart Systems 0.4 Ongoing 2025

Future Plans (2026-2030)

Project Estimated Cost (USD B) Status Notes
New Metro Lines 5.0 Study Network expansion
Regional Rail 8.0 Planning GCC connection
Transit Hubs 2.0 Concept Integration

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -25% 2030 Active
Solar Power 20% usage 2027 Planning
Energy Efficiency +30% 2028 Ongoing

Smart Solutions

Technology Implementation Coverage Status
Smart Cards Network-wide 100% Active
Real-time Info All stations 100% Operating
Mobile Apps All services 100% Active

Special Features

Climate Adaptation

Feature Purpose Implementation
Station Cooling Passenger comfort Advanced HVAC
Platform Screen Doors Climate control All stations
Desert-proof Design Equipment protection System-wide

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 2,500 7,500
Maintenance 1,200 3,600
Support Services 800 2,400

Cultural Integration

Design Features

Element Implementation Purpose
Islamic Architecture Station design Cultural identity
Prayer Rooms All major stations Religious needs
Gender Separation Gold/Family Class Cultural norms

Future Vision

Development Goals

Goal Timeline Investment (USD B)
Network Expansion 2030 15.0
Smart Integration 2028 2.0
Regional Connectivity 2030 8.0
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock