Saudi Arabia Rail Network Profile

Saudi Arabia operates an expanding rail network including high-speed passenger services (Haramain Railway), conventional lines, and new metro systems in major cities, with significant development under Vision 2030.

Network Overview

Parameter Statistics Notes
Total Track Length 5,500 km Active/Under construction
High-Speed Lines 453 km Haramain Railway
Conventional Lines 2,750 km North-South, East-West
Urban Metro 2,297 km Riyadh, Mecca, others
Track Gauge 1,435 mm Standard gauge

Major Systems

Main Lines

Route Length (km) Speed (km/h) Status Type
Haramain Railway 453 300 Operational High-speed
North-South Railway 2,750 160 Active Mixed traffic
East-West Line 1,392 160 Active Mixed traffic
GCC Railway* 2,177 200 Planned Regional

*Under development

Urban Metro Systems

City Lines Length (km) Stations Status
Riyadh 6 176 85 Construction
Mecca 4 114 88 Planning
Jeddah 4 149 72 Planning
Medina 3 95 63 Planning

Technical Parameters

Track Infrastructure

Parameter High-Speed Conventional Urban
Track Gauge 1,435mm 1,435mm 1,435mm
Power Supply 25kV AC Diesel/25kV AC 750V DC
Max Axle Load 17t 32.5t 17t
Signaling ETCS L2 ETCS L1/2 CBTC

Rolling Stock

Passenger Fleet

Type Quantity Manufacturer Speed (km/h) Usage
Talgo 350 35 sets Talgo 300 Haramain
Push-Pull Sets 25 CAF 160 Conventional
Metro Trains 190 Various 90 Urban
Regional Trains 30 Various 160 Mixed

Freight Fleet

Type Quantity Status Usage
Electric Locomotives 40 Active Main lines
Diesel Locomotives 120 Active Heavy haul
Freight Wagons 3,000+ Various Mixed cargo

Operations

Passenger Services

Service Daily Trains Annual Passengers Punctuality
Haramain 30 60M 95%
Conventional 24 4M 90%
Metro (Projected) 1,200+ 3.6M daily –

Freight Traffic

Commodity Annual Volume (M tonnes) Share Trend
Minerals 15 40% Growing
Containers 8 22% Growing
Industrial 7 19% Stable
Agricultural 7 19% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD B) Status Completion
Riyadh Metro 23 Final phase 2026
Land Bridge 7 Planning 2027
GCC Railway 15 Planning 2027

Future Plans (2027-2030)

Project Estimated Cost (USD B) Status Notes
High-Speed Network 25 Planning Multiple corridors
Urban Systems 40 Various Multiple cities
Freight Expansion 10 Concept Capacity increase

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
Solar Power 50% usage 2030 Planning
Energy Efficiency +40% 2028 Active
Carbon Reduction -30% 2030 In progress

Special Features

Desert Operations

Challenge Solution Implementation
Sand Protection Special design Network-wide
Temperature Control Advanced cooling All systems
Water Management Conservation systems All facilities

Smart Solutions

Technology Implementation Coverage Status
Smart Ticketing Network-wide 100% Active
Real-time Info All services 100% Operating
Predictive Maintenance Main lines 80% Expanding
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO