Senegal Rail Network Profile

Senegal operates a limited rail network, with the primary line being the Dakar-Bamako corridor (currently under rehabilitation), and is developing new infrastructure including the Regional Express Train (TER) in Dakar.

Network Overview

Parameter Statistics Notes
Total Track Length 906 km Active/Under rehabilitation
Standard Gauge 36 km TER Dakar
Meter Gauge 870 km Historical network
Electrified Lines 36 km TER only
International Links 1 Mali (under rehabilitation)

Major Systems

Main Lines

Route Length (km) Status Type Gauge
Dakar TER 36 Operational Electric 1,435mm
Dakar-Bamako 645 Rehabilitation Freight/Passenger 1,000mm
Dakar-Thiès 70 Active Mixed 1,000mm
Mining Lines 155 Various Freight 1,000mm

Technical Parameters

Track Infrastructure

Parameter TER Conventional
Track Gauge 1,435mm 1,000mm
Power Supply 25kV AC Diesel
Max Speed 160 km/h 80 km/h
Axle Load 17t 16t

Rolling Stock

TER Fleet

Type Quantity Manufacturer Capacity Status
EMU Sets 15 Alstom 565 Active
Regional Trains 8 Alstom 400 Ordered

Conventional Fleet

Type Quantity Status Usage
Diesel Locomotives 25 Mixed Freight/Passenger
Passenger Cars 30 Limited Regional
Freight Wagons 200 Various Bulk cargo

Operations

Passenger Services

Service Frequency Journey Time Annual Passengers
TER Dakar 15 min peak 45 min 115,000 daily
Regional Services Limited Various Under rehabilitation

Freight Traffic

Commodity Annual Volume (K tonnes) Share Trend
Mining Products 500 45% Growing
Agricultural 300 27% Stable
General Cargo 300 28% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD M) Status Completion
TER Phase 2 500 Construction 2026
Dakar-Bamako Rehab 2,800 Planning 2027
Station Modernization 150 Ongoing 2026

Future Plans (2027-2030)

Project Estimated Cost (USD M) Status Notes
Network Extension 1,200 Planning Regional links
Mining Connections 800 Proposed New lines
Urban Integration 300 Concept Multi-modal

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
Electrification +50km 2030 Planning
Solar Power 30% usage 2028 Proposed
Efficiency +25% 2027 Active

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 2,500 7,500
Maintenance 1,200 3,600
Construction 3,000 9,000

Regional Integration

International Connections

Connection Status Project Timeline
Mali Rehabilitation Dakar-Bamako 2027
Mauritania Planned Future link Post-2030

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Infrastructure Age High Phased rehabilitation
Funding Critical International partnerships
Technical Capacity High Training programs
Climate Resilience Medium Adaptation measures

Smart Solutions

Technology Implementation Coverage Status
E-Ticketing TER system 100% Active
GPS Tracking Main lines 60% Developing
Passenger Info Urban services 80% Active
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock