South Sudan Transport Network Profile

South Sudan has no operational rail network, with historical narrow-gauge lines defunct since independence. Current transportation infrastructure focuses on basic road rehabilitation and river transport, with significant development needs.

Historical Railway

Former Network

Parameter Statistics Notes
Track Length 248 km Defunct
Period Colonial-1960s No longer exists
Gauge 1,067 mm Cape gauge
Route Wau-Babanusa Connected to Sudan

Current Transport Infrastructure

Road Network

Parameter Statistics Notes
Total Road Length 17,000 km Nominal
Paved Roads 300 km Limited condition
All-weather Roads 2,100 km Variable condition
Rural Tracks 14,600 km Basic condition

Major Transport Corridors

Primary Routes

Route Length (km) Status Type
Juba-Nimule 192 Paved International
Juba-Bor 190 Unpaved Domestic
Juba-Yei 170 Mixed Regional
Wau-Raja 220 Basic Regional

River Transport

Major Ports

Facility Location Type Status
Juba Port Juba River port Limited
Bor Port Bor River port Basic
Malakal Port Malakal River port Limited

River Operations

Route Service Type Frequency Status
Juba-Bor Cargo/Passenger Irregular Seasonal
Bor-Malakal Cargo/Passenger Limited Seasonal
Local Services Mixed Variable Weather dependent

Air Transport

Airports

Facility Location Type Runway Length
Juba International Juba International 2,400m
Malakal Malakal Regional 2,000m
Wau Wau Regional 1,800m
Rumbek Rumbek Regional 1,700m

Development Projects

Current Projects (2025-2026)

Project Budget (USD M) Status Completion
Road Rehabilitation 120 Ongoing 2026
River Port Upgrade 45 Planning 2026
Airport Safety 35 Active 2026

Future Plans

Initiative Estimated Cost (USD M) Status Timeline
Transport Master Plan 25 Proposed 2027
Regional Connectivity 180 Concept 2027-2028
Rural Access 150 Planning 2028

Environmental Considerations

Climate Adaptation

Challenge Impact Mitigation Strategy
Flooding Critical Infrastructure elevation
Seasonal Rains High All-weather design
Soil Erosion High Protection measures
River Conditions High Seasonal planning

Economic Impact

Transport Sector

Area Direct Jobs Annual Value (USD M)
Road Transport 3,000 45
River Transport 800 15
Air Transport 600 25

Development Priorities

Short Term (2025-2026)

Priority Scope Investment Need
Basic Access Infrastructure Critical
Safety Operations High
Maintenance Essential High

Long Term Vision

Goal Approach Timeline
Regional Integration Corridor development 2030
Rural Connectivity Access improvement 2028
River Transport System rehabilitation 2027

International Support

Development Partners

Partner Focus Area Support Type
World Bank Infrastructure Financial/Technical
AfDB Transport Loans/Grants
EU Technical Assistance Capacity Building
China Infrastructure Investment

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Security Critical Phased development
Funding High International support
Technical Capacity High Training programs
Maintenance Critical Sustainable systems
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO