Sudan Rail Network Profile

Sudan operates one of Africa’s oldest rail networks, managed by Sudan Railways Corporation (SRC), featuring extensive but aging infrastructure with significant rehabilitation needs and strategic importance for regional connectivity.

Network Overview

Parameter Statistics Notes
Total Track Length 4,725 km Nominal network
Operational Lines 2,800 km Active service
Track Gauge 1,067 mm Cape gauge
Electrified Lines 0 km Diesel operation
International Links 2 Egypt, Port Sudan

Major Lines

Main Routes

Route Length (km) Status Usage Speed (km/h)
Khartoum-Port Sudan 787 Active Main corridor 60-80
Khartoum-Wadi Halfa 950 Limited Egypt link 40-60
Khartoum-Nyala 1,100 Partial Western line 40
Atbara-Sennar 460 Active Central line 50-60

Technical Parameters

Track Infrastructure

Parameter Main Lines Secondary Branch Lines
Track Gauge 1,067mm 1,067mm 1,067mm
Rail Profile 80 lbs 75 lbs 60 lbs
Max Axle Load 16.5t 15t 13.5t
Signaling Basic Manual Basic

Rolling Stock

Locomotive Fleet

Type Quantity Manufacturer Status Usage
GT26 25 EMD Mixed Main line
DL500B 15 GE Limited Mixed traffic
DF8B 10 CRRC Active Main line
Shunters 20 Various Mixed Yards

Passenger Cars

Type Quantity Capacity Status Service
Standard Coach 180 72 seats Mixed Regular
First Class 45 54 seats Limited Express
Mixed Class 120 Various Mixed Local

Operations

Passenger Services

Service Type Weekly Services Annual Passengers Punctuality
Main Line 14 1.2M 45%
Regional 21 800K 40%
Local 35 600K 35%

Freight Traffic

Commodity Annual Volume (K tonnes) Share Trend
Agricultural 450 35% Seasonal
Minerals 350 27% Stable
General Cargo 300 23% Variable
Fuel 200 15% Stable

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD M) Status Completion
Track Rehabilitation 280 Ongoing 2027
Rolling Stock Renewal 150 Planning 2026
Signaling Upgrade 85 Proposed 2026

Future Plans (2027-2030)

Project Estimated Cost (USD M) Status Notes
Port Sudan Link 400 Planning Capacity increase
Western Extension 300 Concept Regional connection
Station Modernization 120 Proposed Major stations

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
Fuel Efficiency +20% 2030 Planning
Water Conservation +30% 2028 Initial
Desert Protection Ongoing 2027 Active

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 12,000 36,000
Maintenance 4,000 12,000
Administration 2,000 6,000

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Infrastructure Age Critical Phased rehabilitation
Desert Environment High Specialized maintenance
Technical Capacity High Training programs
Funding Critical International partnerships

International Support

Development Partners

Partner Focus Area Support Type
China Infrastructure Technical/Financial
World Bank Rehabilitation Loans
AfDB Modernization Grants/Technical
Arab Fund Development Financial

Desert Operations

Adaptation Measures

Aspect Strategy Implementation
Sand Protection Barriers/Clearing Ongoing
Heat Management Track monitoring Active
Water Resources Conservation Planning
Infrastructure Desert-proof design Developing
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO