Suriname Transport Network Profile

Suriname has no active rail network, with only historical narrow-gauge lines that served mining operations now defunct. Transportation infrastructure focuses on road networks, river transport, and air services.

Historical Railway

Former Mining Railways

Parameter Statistics Notes
Track Length 86 km Defunct
Period 1903-1986 Mining operations
Gauge 1,000 mm Narrow gauge
Purpose Bauxite transport Lardner’s Point-Onverdacht

Current Transport Infrastructure

Road Network

Parameter Statistics Notes
Total Road Length 4,304 km All categories
Paved Roads 1,130 km 26% of network
East-West Connection 380 km Main corridor
Rural Roads 2,794 km Variable condition

Maritime Infrastructure

Major Ports

Facility Location Type Usage
Paramaribo Port Paramaribo Multi-purpose Main gateway
Nieuwe Haven Paramaribo Container/General Commercial
Moengo Marowijne Bulk Mining/Limited
Nickerie Nickerie Agricultural Seasonal

River Transport

Waterway Length (km) Type Status
Suriname River 480 Commercial Active
Corantijn River 380 Mixed Limited
Commewijne River 110 Local Active

Air Transport

Airports

Facility Location Type Runway Length
Johan Adolf Pengel Paramaribo International 3,300m
Zorg en Hoop Paramaribo Regional 750m
Nickerie Nickerie Regional 1,400m

Development Projects

Current Projects (2025-2026)

Project Budget (USD M) Status Completion
Road Rehabilitation 45 Ongoing 2026
Port Modernization 65 Active 2026
Airport Upgrade 35 Planning 2026

Future Plans

Initiative Estimated Cost (USD M) Status Timeline
Transport Integration 25 Proposed 2027
River Navigation 40 Planning 2027-2028
Rural Connectivity 30 Concept 2028

Environmental Considerations

Climate Adaptation

Challenge Impact Mitigation Strategy
Flooding Critical Infrastructure elevation
Heavy Rainfall High Drainage systems
Coastal Erosion High Protection measures
River Conditions High Navigation improvements

Economic Impact

Transport Sector

Area Direct Jobs Annual Value (USD M)
Maritime/River 1,200 45
Aviation 800 35
Road Transport 2,000 55

Development Priorities

Short Term (2025-2026)

Priority Scope Investment Need
Port Efficiency Infrastructure High
Road Safety Operations High
Air Connectivity Essential Medium

Long Term Vision

Goal Approach Timeline
Regional Integration Corridor development 2030
River Transport System enhancement 2028
Rural Access Infrastructure improvement 2027

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Infrastructure Age High Phased renewal
Climate Vulnerability Critical Resilient design
Funding High International partnerships
Maintenance High Sustainable systems

International Support

Development Partners

Partner Focus Area Support Type
IDB Infrastructure Financial/Technical
Netherlands Maritime Technical Assistance
China Port Development Investment
Caribbean Dev Bank Transport Loans/Grants
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO