Tanzania Rail Network Profile

Tanzania operates two separate railway systems: the Tanzania Railways Corporation (TRC) network and the Tanzania-Zambia Railway Authority (TAZARA), with significant development including new standard gauge railway (SGR) construction.

Network Overview

Parameter Statistics Notes
Total Track Length 3,682 km Combined networks
TRC Network 2,707 km Meter gauge
TAZARA 975 km Cape gauge
SGR (New) 1,219 km* Under construction
Track Gauges Mixed 1,000mm/1,067mm/1,435mm

*Planned total

Major Systems

Standard Gauge Railway (SGR)

Section Length (km) Status Completion Speed (km/h)
Dar-Morogoro 300 Operational 2024 160
Morogoro-Makutupora 422 Construction 2025 160
Makutupora-Tabora 497 Planning 2026 160
Tabora-Isaka 165 Planning 2027 160

Existing Networks

Route Length (km) Gauge Status Usage
Central Line (TRC) 1,254 1,000mm Limited Mixed
TAZARA 975 1,067mm Active Mixed
Tanga Line 442 1,000mm Limited Mixed

Technical Parameters

Track Infrastructure

Parameter SGR TRC TAZARA
Track Gauge 1,435mm 1,000mm 1,067mm
Rail Profile 60kg/m 30kg/m 45kg/m
Max Axle Load 35t 16t 18t
Signaling ETCS L2 Basic Basic

Rolling Stock

SGR Fleet

Type Quantity Manufacturer Speed (km/h) Usage
Electric Locomotives 17 CRRC 160 Mixed
Passenger Sets 10 CRRC 160 Express
Freight Locomotives 15 CRRC 120 Freight

Existing Fleet

Type Quantity Status Network Usage
Diesel Locomotives 75 Mixed TRC/TAZARA Mixed
Passenger Cars 150 Mixed TRC/TAZARA Passenger
Freight Wagons 2,100 Various TRC/TAZARA Freight

Operations

Passenger Services

Service Frequency Journey Time Annual Passengers
SGR Express Daily 2h (Dar-Morogoro) 1.2M*
TAZARA 2x weekly 36h (Dar-Kapiri) 450,000
Central Line Weekly Various 300,000

*Projected

Freight Traffic

Commodity Annual Volume (M tonnes) Share Trend
General Cargo 2.5 35% Growing
Mining Products 1.8 25% Stable
Agricultural 1.5 21% Growing
Containers 1.4 19% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (USD B) Status Completion
SGR Phase 3-4 2.5 Planning 2027
TAZARA Upgrade 0.8 Ongoing 2026
TRC Rehabilitation 0.6 Active 2026

Future Plans (2027-2030)

Project Estimated Cost (USD B) Status Notes
SGR Extensions 3.2 Planning Regional links
Port Connectivity 0.9 Proposed Capacity increase
Isaka-Rwanda Link 2.5 Concept Regional integration

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
Electrification SGR Network 2030 In progress
Energy Efficiency +30% 2028 Planning
Carbon Reduction -25% 2030 Initial phase

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 8,000 24,000
Construction 12,000 36,000
Maintenance 4,000 12,000

Regional Integration

International Connections

Country Status Project Timeline
Zambia Active TAZARA Operating
Rwanda Planned SGR Extension 2028+
Burundi Proposed Future link Planning
DRC Concept Future link Long-term
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock