Thailand Rail Network Profile

Thailand operates an extensive rail network managed by State Railway of Thailand (SRT), with significant modernization including high-speed rail development and urban systems in Bangkok, focusing on regional connectivity and urban mobility.

Network Overview

Parameter Statistics Notes
Total Track Length 4,507 km Active network
Electrified Lines 250 km Urban/Airport link
Double Track 1,200 km Expanding
Track Gauge 1,000 mm Meter gauge
High-Speed Lines Under construction Standard gauge

Major Systems

Main Lines

Route Length (km) Status Type Speed (km/h)
Northern Line 751 Active/Upgrading Main line 120
Northeastern Line 1,045 Active/Upgrading Main line 120
Eastern Line 266 Active/Upgrading Main line 120
Southern Line 1,159 Active/Upgrading Main line 120

Urban Systems

System Length (km) Stations Daily Riders Type
BTS Skytrain 68.2 59 900K Urban
MRT 70.0 53 400K Metro
Airport Rail Link 28.6 8 72K Airport link

Technical Parameters

Track Infrastructure

Parameter Main Lines High-Speed* Urban
Track Gauge 1,000mm 1,435mm 1,435mm
Power Supply Diesel 25kV AC 750V DC/25kV AC
Max Axle Load 20t 23t 16t
Signaling ETCS L1 ETCS L2 CBTC

*Under construction

Rolling Stock

Main Line Fleet

Type Quantity Manufacturer Usage Status
Diesel Locomotives 217 Various Mixed Active
DMUs 88 sets Various Passenger Active
Passenger Cars 912 Various Passenger Mixed
Freight Wagons 3,000+ Various Freight Mixed

Urban Fleet

Type Quantity Manufacturer Capacity System
Siemens EMU 52 sets Siemens 1,000 BTS
CNR EMU 54 sets CRRC 1,000 MRT
Siemens Airport 9 sets Siemens 745 Airport Link

Operations

Passenger Services

Service Type Daily Services Annual Passengers Punctuality
Long Distance 80 15M 75%
Commuter 200 35M 85%
Urban Rail 1,500+ 800M 98%

Freight Traffic

Commodity Annual Volume (M tonnes) Share Trend
Container 12 35% Growing
Bulk Cargo 10 29% Stable
Oil Products 8 24% Stable
General Cargo 4 12% Growing

Infrastructure Development

Current Projects (2025-2027)

Project Budget (THB B) Status Completion
Thai-Chinese HSR 179.4 Construction 2027
Double Tracking 398.4 Various 2026
Urban Extensions 235.3 Active 2026

Future Plans (2027-2030)

Project Estimated Cost (THB B) Status Notes
Southern HSR 560 Planning Malaysia link
Eastern HSR 220 Proposed Airport connection
Regional Links 180 Concept ASEAN connectivity

Environmental Initiatives

Sustainability Goals

Initiative Target Timeline Status
CO2 Reduction -30% 2030 In progress
Energy Efficiency +25% 2028 Active
Electrification +500km 2030 Planning

Economic Impact

Employment

Sector Direct Jobs Indirect Jobs
Operations 25,000 75,000
Construction 15,000 45,000
Maintenance 10,000 30,000

Regional Integration

International Connections

Country Status Project Timeline
Laos-China Construction HSR 2027
Malaysia Planning HSR 2030+
Cambodia Proposed Standard Gauge Future
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
100% Free SEO Tools - Tool Kits PRO