Timor-Leste Transport Network Profile

Timor-Leste has no rail network. Transportation infrastructure focuses on road networks, maritime facilities, and air transport, with significant development needs for basic infrastructure.

Transport Infrastructure Overview

Road Network

Parameter Statistics Notes
Total Road Length 6,040 km All categories
National Roads 1,426 km Primary routes
District Roads 869 km Secondary
Rural Roads 3,745 km Limited condition
Paved Roads 2,600 km 43% of network

Maritime Infrastructure

Major Ports

Facility Location Type Usage
Dili Port Dili Multi-purpose Main gateway
Com Port Com Small port Regional/Fishing
Hera Port Hera Naval/Commercial Mixed use
Oecusse Port Oecusse Regional Enclave access

Maritime Operations

Service Type Frequency Capacity Route
Coastal Shipping Weekly Various Domestic
International Monthly Cargo Regional
Ferry Services Daily 200 pax Oecusse-Dili

Air Transport

Airports

Facility Location Type Runway Length
Presidente Nicolau Lobato Dili International 1,850m
Oecusse Oecusse Regional 1,050m
Suai Suai Regional 1,500m
Baucau Baucau Military/Civil 2,500m

Development Projects

Current Projects (2025-2026)

Project Budget (USD M) Status Completion
Road Rehabilitation 45 Ongoing 2026
Port Modernization 65 Active 2026
Airport Expansion 35 Planning 2026

Future Plans

Initiative Estimated Cost (USD M) Status Timeline
Transport Master Plan 15 Proposed 2027
Rural Connectivity 85 Planning 2027-2028
Maritime Safety 25 Concept 2028

Environmental Considerations

Climate Adaptation

Challenge Impact Mitigation Strategy
Flooding High Infrastructure elevation
Landslides Critical Slope stabilization
Coastal Erosion High Protection measures
Heavy Rainfall High Drainage systems

Economic Impact

Transport Sector

Area Direct Jobs Annual Value (USD M)
Maritime 450 15
Aviation 250 12
Road Transport 800 25

Development Priorities

Short Term (2025-2026)

Priority Scope Investment Need
Road Safety Infrastructure High
Port Efficiency Operations High
Rural Access Connectivity Critical

Long Term Vision

Goal Approach Timeline
Sustainability Climate resilience 2030
Regional Integration Port development 2028
Rural Development Access improvement 2027

Challenges & Solutions

Key Issues

Challenge Impact Solution Strategy
Infrastructure Quality Critical Phased improvement
Funding Constraints High International support
Technical Capacity High Training programs
Maintenance High Sustainable systems

International Support

Development Partners

Partner Focus Area Support Type
World Bank Infrastructure Financial/Technical
ADB Transport Loans/Grants
Australia Maritime Safety Technical Assistance
Japan Port Development Investment
Ads Blocker Image Powered by Code Help Pro

Ads Blocker Detected!!!

We have detected that you are using extensions to block ads. Please support us by disabling these ads blocker.

Powered By
Best Wordpress Adblock Detecting Plugin | CHP Adblock